Interstate I-5 Road Conditions in Oregon

 

Oregon DOT Traffic Cameras

Incidents (18)

5

South

Road Construction - Estimated delay under 20 minutes

PACIFIC
I-5, Intersection with Pacific Highway ORE99
Road construction is occurring. Use caution.
Watch for single-lane traffic in each direction through the end of May between MP 6.5 to 9.5. Crews are improving the southbound slow lane by demolishing and reconstructing the lane. The construction zone speed limit is 45 mph. Expect slow moving traffic and minor delays. This multi-year project wraps up this summer with asphalt paving of shoulders, drain adjustments, recessed pavement markers and rumble strips and final striping.
5

North

Road Construction - No to Minimum Delay

PACIFIC
I-5, Intersection with Pacific Highway ORE99
Road construction is occurring causing no to minimum delays. Use caution.
5

South

Road Construction - Estimated delay under 20 minutes

PACIFIC
I-5, 12 miles North of Sutherlin
Road construction is occurring. Use caution. Ramps Affected.
This project will replace the bridge deck in the I-5 southbound slow (right) lane at MP 148.2. Starting Wednesday, April 27, southbound I-5 traffic will be limited to a single lane near Exit 148 (Rice Hill). Concrete barrier will be in place. The southbound on-ramp at Exit 148 will be closed (local motorists can detour north on I-5 to Exit 150 in order access the southbound lanes). Flaggers will provide intermittent traffic control on Rice Hill Frontage Road. All work is expected to be complete by Memorial Day weekend.
5

North

Road Construction - Estimated delay under 20 minutes

PACIFIC
I-5, 7 miles South of Roseburg
Road construction is occurring. Use caution.
This project will pave five miles of I-5 and build climbing lanes on the northbound and southbound approach to Roberts Mountain. The contractor has resumed work on the project. This will involve paving the final section of the northbound lanes over Roberts Mountain, applying permanent striping in both directions, and completing other final work. Watch for intermittent lane closures in both directions throughout April and May.
5

South

Road Construction - Estimated delay under 20 minutes

PACIFIC
I-5, 1 mile South of Wilsonville
Periodic nighttime single lane closures on I-5 north at the Boone Bridge as weather allows.
Work is weather dependent.
5

North

Road Construction - Estimated delay under 20 minutes

PACIFIC
I-5, 7 miles South of Roseburg
Road construction is occurring. Use caution.
This project will pave eight miles of I-5 between the Garden Valley interchange and Roberts Creek and install or replace sidewalk ADA ramps. Watch for intermittent weeknight (Sunday night to Friday morning, 9 p.m. to 6 a.m.) ramp, lane and shoulder closures.
5

North

Road Construction - No to Minimum Delay

PACIFIC
I-5, 1 mile South of Portland, Intersection with SW Capitol Highway
Nighttime single and double lane closures on I-5 south from 7:30 p.m. to 5:30 a.m.
5

North

Road Construction - Estimated delay under 20 minutes

PACIFIC
I-5, Intersection with Pacific Highway ORE99
Road construction is occurring. Use caution. Ramps Affected.
Watch for single-lane traffic under the I-5 Exit 58 bridges. The contractor is strengthening these bridges to better withstand an earthquake.
5

North

Road Construction - No to Minimum Delay

PACIFIC
I-5, 2 miles North of Roseburg
Road construction is occurring causing no to minimum delays. Use caution.
This project will replace ADA sidewalk ramps at several locations in southern Oregon. Pedestrians will be provided alternate routes when sidewalks are closed. Ramps are mostly finished Roseburg. Some final paving work along shoulders remains, but probably will not impact traffic or pedestrians.
5

South

Road Construction - Informational Only

PACIFIC
I-5, Canyonville
Road construction is or will be occurring. Use caution.
This project will replace ADA sidewalk ramps at several locations in southern Oregon. Pedestrians will be provided alternate routes when sidewalks are closed. Ramps are mostly finished in Canyonville, Tri City and Roseburg. Some final paving work along shoulders remains, but probably will not impact traffic or pedestrians.
5

North

Road Construction - Estimated delay under 20 minutes

PACIFIC
I-5, Oregon - California Border
Road construction is occurring. Use caution.
Watch for single-lane traffic in each direction through the end of May between MP 6.5 to 9.5. Crews are improving the southbound slow lane by demolishing and reconstructing the lane. The construction zone speed limit is 45 mph. Expect slow moving traffic and minor delays. This multi-year project wraps up this summer with asphalt paving of shoulders, drain adjustments, recessed pavement markers and rumble strips and final striping.
5

South

Road Construction - No to Minimum Delay

PACIFIC
I-5, Canyonville
Road construction is occurring causing no to minimum delays. Use caution.
This project will replace ADA sidewalk ramps at several locations in southern Oregon. Pedestrians will be provided alternate routes when sidewalks are closed. Ramps are mostly finished in Canyonville. Some final paving work along shoulders remains, but probably will not impact traffic or pedestrians.
5

South

Road Construction - No to Minimum Delay

PACIFIC
I-5, 6 miles North of Canyonville
Road construction is occurring causing no to minimum delays. Use caution.
This project will replace ADA sidewalk ramps at several locations in southern Oregon. Pedestrians will be provided alternate routes when sidewalks are closed. Ramps are mostly finished in Tri City. Some final paving work along shoulders remains, but probably will not impact traffic or pedestrians.
5

North

Road Construction - No to Minimum Delay

PACIFIC
I-5, 5 miles North of Woodburn
Road construction is occurring causing no to minimum delays. Use caution.
5

South

Road Construction - No to Minimum Delay

PACIFIC
I-5, Portland, Intersection with Killingsworth St
Daytime lane closures on Alberta Street over I-5 Wednesday.
5

North

Road Maintenance Operations - Estimated delay under 20 minutes

PACIFIC
I-5, 6 miles North of Oregon - California Border
Road maintenance operations are occurring. Use caution.
5

North

Road Maintenance Operations - Estimated delay under 20 minutes

PACIFIC
I-5, 3 miles North of Oregon - California Border
Road maintenance operations are occurring. Use caution.
5

South

Road Maintenance Operations - Estimated delay under 20 minutes

PACIFIC
I-5, 5 miles South of Ashland
Road maintenance operations are occurring. Use caution.

Oregon Message Signs (66) See All

5

South

BRIDGE WORK
HWY 38 MP
16
EXPECT
DELAYS
5

North

TRAVEL TIME TO:
OR217 10MIN
99E VIA I205 14MIN
5

South

TRAVEL TIME TO:
I-205 3 MIN
WILSONVILLE 9 MIN
5

North

TRAVEL TIME TO:
I205 VIA I84 13MIN
SR 14 12MIN
5

North

TRAVEL TIME TO:
SR 500 6 MIN
I-205 13 MIN
5

North

TRAVEL TIME TO:
US26 VIA OR217 10 MIN
I-405 11 MIN
5

South

TRAVEL TIME TO:
OR217 VIA US26 12 MIN
OR217 VIA I-5 16 MIN
5

South

TRAVEL TIME TO:
OR217 7 MIN
I-205 11 MIN
5

North

33
42
5

North

19
28
5

South

TRAVEL TIME TO:
I-84 7 MIN
US26 VIA I-405 8 MIN
5

South

CONGESTION
AHEAD
RIGHT LANE
5

South

STOPPED
TRAFFIC
5

North

CAUTION
SHARP CURVES
AHEAD
5

South

CAUTION
SHARP CURVES
AHEAD
INTERNAL_SERVER_ERROR
Wiki page not found
wikipedia
wiki