Interstate I-5 Road Conditions in Oregon

 

TripCheck Oregon Incidents (15)

5

South

Road Construction - No to Minimum Delay

PACIFIC
I-5, 1 mile South of Wilsonville
No traffic impacts.
5

North

Road Construction - Estimated delay under 20 minutes

PACIFIC
I-5, 7 miles South of Roseburg
Road construction is occurring. Use caution.
This project will pave eight miles of I-5 between the Garden Valley interchange and Roberts Creek and install or replace sidewalk ADA ramps. Watch for intermittent weeknight (Sunday night to Friday morning, 9 p.m. to 6 a.m.) ramp, lane and shoulder closures.
5

North

Road Construction - Estimated delay under 20 minutes

PACIFIC
I-5, 1 mile South of Portland, Intersection with SW Capitol Highway
Nighttime single and double lane closures on northbound I-5 from 7:30 p.m. to 5:30 a.m. . Monday through Saturday
5

South

Road Construction - Informational Only

PACIFIC
I-5, Canyonville
Road construction is or will be occurring. Use caution.
This project will replace ADA sidewalk ramps at several locations in southern Oregon. Pedestrians will be provided alternate routes when sidewalks are closed. Ramps are mostly finished in Canyonville, Tri City and Roseburg. Some final paving work along shoulders remains, but probably will not impact traffic or pedestrians.
5

North

Road Construction - Estimated delay under 20 minutes

PACIFIC
I-5, Oregon - California Border
Road construction is occurring. Use caution.
Watch for single-lane traffic in each direction between MP 6.5 and 9.5. Crews are improving the southbound slow lane by demolishing and reconstructing the lane. The construction zone speed limit is lowered to 40 mph. Expect slow-moving traffic and minor delays. This multi-year project wraps up this summer with asphalt paving of shoulders, drain adjustments, recessed pavement markers and rumble strips and final striping.
5

South

Road Construction - No to Minimum Delay

PACIFIC
I-5, Portland, Intersection with Killingsworth St
Night lane closures at Washington Street over I-205 Monday and on I-5 at Alberta Tuesday. Daytime lane closures on Lombard over I-5 Friday.
5

South

Road Construction - Estimated delay under 20 minutes

PACIFIC
I-5, Intersection with Pacific Highway ORE99
Road construction is occurring. Use caution.
Through August 17, the southbound Exit 6 on-ramp will be closed for I-5 bridge deck corrective work. To reach southbound I-5, local traffic should take Old Siskiyou Highway (OR 273) to Exit 1 and into California. Southbound I-5 will be limited to a single lane of traffic in vicinity of Exit 6 and the bridge over Oregon 273. The work zone speed limit has been lowered to 40 mph. Expect slow moving traffic and minor delays. This multi-year project wraps up this fall with asphalt paving of shoulders, drain adjustments, recessed pavement markers and rumble strips and final striping.
5

North

Road Construction - No to Minimum Delay

PACIFIC
I-5, Intersection with Pacific Highway ORE99
Road construction is occurring causing no to minimum delays. Use caution.
This project will pave five miles of I-5 and build climbing lanes on the northbound and southbound approach to Roberts Mountain. Watch for intermittent lane closures and ramp work Sunday through Friday nights (9 p.m. to 6 a.m.) installing pavement markings.
5

North

Road Construction - No to Minimum Delay

PACIFIC
I-5, 5 miles South of Wilsonville
Road construction is occurring causing no to minimum delays. Use caution.
Construction at the Aurora Donald interchange may require occasional shoulder closure on I-5 Northbound. Construction on Ehlen Road continues nightly from 8:00 pm to 6:00 am Sunday night through Friday morning and may impact the exit ramps at Exit 278.
5

North

Road Construction - Estimated delay under 20 minutes

PACIFIC
I-5, 6 miles South of Woodburn
Road construction is occurring. Use caution.
5

South

Road Maintenance Operations - No to Minimum Delay

PACIFIC
I-5, Portland, Intersection with Victory Blvd
Road maintenance operations are occurring causing no to minimum delays. Use caution. Ramps Affected.
5

North

Road Maintenance Operations - Estimated delay under 20 minutes

PACIFIC
I-5, 1 mile North of Oregon - California Border
Road maintenance operations are occurring. Use caution.
5

North

Road Maintenance Operations - Estimated delay under 20 minutes

PACIFIC
I-5, 7 miles South of Ashland
Road maintenance operations are occurring. Use caution.
5

South

Road Maintenance Operations - No to Minimum Delay

PACIFIC
I-5, 6 miles North of Oregon - California Border
Road maintenance operations are occurring causing no to minimum delays. Use caution.
5

North

Disabled Vehicle - Hazard - Estimated delay under 20 minutes

PACIFIC
I-5, Intersection with Pacific Highway ORE99
A disabled vehicle is creating a hazard. Use caution. Ramps Affected.

I-5 Major Junctions (15)

View incidents along related routes

Oregon Message Signs (66) See All

5

North

TRAVEL TIME TO:
OR217 10MIN
99E VIA I205 14MIN
5

South

TRAVEL TIME TO:
I-205 3 MIN
WILSONVILLE 8 MIN
5

North

TRAVEL TIME TO:
I205 VIA I84 13MIN
SR 14 14MIN
5

North

TRAVEL TIME TO:
SR 500 6 MIN
I-205 13 MIN
5

North

TRAVEL TIME TO:
US26 VIA OR217 12 MIN
I-405 11 MIN
5

South

TRAVEL TIME TO:
OR217 VIA US26 12 MIN
OR217 VIA I-5 16 MIN
5

South

TRAVEL TIME TO:
OR217 7 MIN
I-205 11 MIN
5

North

32
38
5

North

20
27
5

South

ADVISORY
SPEED40
5

South

ADVISORY
SPEED40
5

South

ADVISORY
SPEED40
5

South

ADVISORY
SPEED30
5

South

ADVISORY
SPEED30
5

South

ADVISORY
SPEED30
5

South

TRAVEL TIME TO:
I-84 8 MIN
US26 VIA I-405 8 MIN
5

South

CONGESTION
AHEAD
RIGHT LANE
5

South

STOPPED
TRAFFIC
5

North

SLOW
DOWN
YOUR SPEED
IS
MPH
5

South

SLOW
DOWN
YOUR SPEED
IS
MPH

Other Routes

<< OR-3 Sign OR-3OR-6 OR-6 Sign >>