Interstate I-5 Traffic & Road Conditions in Oregon
Oregon DOT Traffic Cameras
TripCheck Oregon Incidents (9)
South
Road Construction - Estimated delay under 20 minutes
PACIFIC
I-5, 1 mile North of Portland, Intersection with SW Capitol Highway
SW 26th Avenue under I-5 is closed through spring 2024. Periodic lane and shoulder closures on I-5.
North
Road Construction - Estimated delay under 20 minutes
PACIFIC
I-5, Roseburg
Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected.
North
Road Construction - Estimated delay under 20 minutes
PACIFIC
I-5, 5 miles South of Medford
Road construction is occurring. Prepare to slow. Watch for workers.
North
Road Construction - No to Minimum Delay
PACIFIC
I-5, 1 mile South of Wilsonville
The right lane will be closed on I-5 NB on Feb. 22, at Boone Bridge. Crews will be doing survey work. Use caution and watch for workers.
The right lane will be closed on I-5 NB on Feb. 22, during daytime hours. Use caution and watch for workers. Crews will be doing survey work at the Boone Bridge on I-5.
North
Road Construction - Estimated delay under 20 minutes
PACIFIC
I-5, 7 miles South of Medford
Road construction is occurring. Prepare to slow. Watch for workers.
North
Road Construction - Estimated delay under 20 minutes
PACIFIC
I-5, Intersection with Pacific Highway ORE99
Road construction is occurring. Prepare to slow. Watch for workers.
North
Road Construction - Estimated delay under 20 minutes
PACIFIC
I-5, Albany
Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected.
Road Construction - Estimated delay under 20 minutes
HISTORIC COLUMBIA RIVER
HWY100, 5 miles West of Ainsworth State Park
No traffic impacts.
Project description: Two 100 year-old elevated roadways that provide access to Multnomah Falls require repairs to continue providing access to one of Oregon's most iconic sites. The elevated roadways – called viaducts – carry vehicles and bicycles to the Falls and Lodge from the Historic Columbia River Highway. The west viaduct will be closed fall 2024 through spring 2025. The east viaduct will be closed fall 2025 through spring 2026.
<!--Links Start Here-->
[Link to Additional Information](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx)
Bridge Work - Estimated delay under 20 minutes
MCMINNVILLE SPUR
Bridge work is occurring. Prepare to slow.
Bridge work continues. Use caution. Expect traffic delays of up to 20 minutes several through early 2024.
<!--Links Start Here-->
[Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19389)
I-5 Major Junctions (15)
View incidents along related routes
- Ashland, Oregon
- Grants Pass
- Eugene
- Eugene
- Springfield
- Albany
- Salem
- Tualatin
- Portland
- Portland
- Portland
- Portland
- Portland
- Portland
- Washington (state)
No active ODOT Message Signs found.