Highway US-20 Road Conditions in Oregon

 

TripCheck Oregon Incidents (9)

20

Animal on Roadway - No to Minimum Delay

CENTRAL OREGON
US20, 3 miles West of Hines
Animals are on the roadway are causing minimal delay to traffic. Use caution.
20

Road Construction - Estimated delay under 20 minutes

SANTIAM
US20, Intersection with Albany - Junction City Highway ORE99E
Road construction is occurring. Prepare to slow. Watch for workers.
20

Road Construction - Estimated delay under 20 minutes

SANTIAM
US20, Intersection with Halsey - Sweet Home Highway ORE228
Road construction is occurring. Prepare to slow. Watch for workers.
During construction expect delays up to 20 minutes. Work is expected to occur Monday through Friday, between 7:00am to 5:00pm.
20

Road Construction - Informational Only

MCKENZIE-BEND
US20, 2 miles South of Intersection with The Dalles - California Highway US97
Road construction is or will be occurring. Watch for single lane closures. Use caution.
Work consists of updates to the sidewalks, bike lanes and ADA ramps. Updates to the signals, illumination devices, and storm water and drainage features. Updates to the bus stop locations, installation of new signs, and the installation of rapid flashing beacon crosswalks.
20

Road Construction - Estimated delay under 20 minutes

MCKENZIE-BEND
US20, Tumalo
Road construction is occurring. Prepare to slow. Watch for workers.
<!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20011)
20

Road Construction - No to Minimum Delay

ALBANY-CORVALLIS
US20, 3 miles West of Albany
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
20

Road Construction - Estimated delay under 20 minutes

HISTORIC COLUMBIA RIVER
HWY100, 5 miles West of Ainsworth State Park
No Traffic Impacts.
20

East

Road Construction - Estimated delay under 20 minutes

CLACKAMAS
ORE224, Intersection with Pacific Highway East ORE 99E (McLoughlin Blvd)
No traffic Impacts.
Project Description: We are installing modern traffic signal controllers, additional vehicle radar detection equipment and traffic monitoring cameras along Oregon 224 (Milwaukie Expressway) from SE 17th Avenue to I-205. We are also adding new thermal imaging sensors at five signalized intersections on OR 224 to detect bicyclists and trigger longer green lights, allowing them more time to cross wide intersections. The new equipment will allow ODOT engineers and technicians to monitor traffic signal performance, manage congestion and improve safety along this corridor.
20

Bridge Work - Estimated delay under 20 minutes

MCMINNVILLE SPUR
Bridge work is occurring. Use caution. Expect minor delays.
Between 9 a.m. to 3 p.m. daily, Monday through Friday, expect short delays and intermittent lane closures controlled by flaggers for material and equipment delivery.

US-20 Major Junctions (10)

View incidents along related routes

No ODOT Message Signs found. (View All)

Other Routes

<< OR-19 Sign OR-19OR-22 OR-22 Sign >>
INTERNAL_SERVER_ERROR
Cannot read properties of undefined (reading 'forEach')
oregon
dmsStatus