Highway US-30 Road Conditions in Oregon

 

TripCheck Oregon Incidents (6)

30

Road Construction - Estimated delay under 20 minutes

LOWER COLUMBIA RIVER
US30, Portland
No traffic impacts.
We are making safety improvements for people walking, biking, rolling, driving and moving freight on U.S. 30 (NW St. Helens Road), between NW Bridge Avenue and NW Kittridge Avenue. We are repaving the roadway, replacing traffic signals, adjusting vehicle lane widths, building curb ramps to meet Americans with Disabilities Act (ADA) requirements and improving conditions for people biking.
30

Road Construction - Estimated delay under 20 minutes

LOWER COLUMBIA RIVER
US30, Saint Helens
Road construction is occurring. Prepare to slow. Watch for workers.
Expect delays and lane closures. Traffic on U.S. 30 will not be detoured. The intersections of U.S. 30 and Millard Road and/or U.S. 30 and Bennett Road will be impacted at various times during construction. Work will be done Monday through Friday, from 6 a.m. to 5 p.m. There may be night work needed. Construction is estimated to be completed in June 2023.
30

Road Construction - Estimated delay under 20 minutes

HISTORIC COLUMBIA RIVER
HWY100, 5 miles West of Ainsworth State Park
No Traffic Impacts.
30

Road Construction - No to Minimum Delay

HISTORIC COLUMBIA RIVER
US30, 1 mile East of Hood River
Utility work is occurring. Pedestrian detours.
This project will rebuild the intersection of U.S. 30 (Cascade Ave.) and Rand Road to align the north and south roads of the intersection, add a traffic signal, improve or add sidewalk and curb ramps accessible to people with disabilities, improve storm water drainage, and add new street-lighting. These changes will increase safety and improve traffic operations and accessibility for all travelers. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20519)
30

East

Road Construction - Estimated delay under 20 minutes

CLACKAMAS
ORE224, Intersection with Pacific Highway East ORE 99E (McLoughlin Blvd)
No traffic Impacts.
Project Description: We are installing modern traffic signal controllers, additional vehicle radar detection equipment and traffic monitoring cameras along Oregon 224 (Milwaukie Expressway) from SE 17th Avenue to I-205. We are also adding new thermal imaging sensors at five signalized intersections on OR 224 to detect bicyclists and trigger longer green lights, allowing them more time to cross wide intersections. The new equipment will allow ODOT engineers and technicians to monitor traffic signal performance, manage congestion and improve safety along this corridor.
30

Bridge Work - Estimated delay under 20 minutes

MCMINNVILLE SPUR
Bridge work is occurring. Use caution. Expect minor delays.
Between 9 a.m. to 3 p.m. daily, Monday through Friday, expect short delays and intermittent lane closures controlled by flaggers for material and equipment delivery.

US-30 Major Junctions (11)

View incidents along related routes

Oregon Message Signs (6) See All

Data provided by: ODOT.org

Other Routes

<< OR-27 Sign OR-27OR-31 OR-31 Sign >>