US97, 22 miles North of Klamath Falls
ID: 22T021969
Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
Bridge work on USBR Bridge at MP 273.71, Link River Bridge at MP 275.03, and the Green Spring Bridge at MP 277.12. USBR Bridge at MP 273.71: Bridge work will be done under the bridge, no delays expected. Link River Bridge at MP 275.03: Lane shift traffic control installed on Main Street, bridge work will be done behind the barrier, no delays expected. Conger Avenue is closed for thru traffic, detour in place. OR140 at the Green Springs Bridge: Lane shift traffic control installed, bridge work will be done behind the barrier, no delays expected.