In Calistoga Lane #1, and the right shoulder will be closed overnight for sewer work along North / southbound Highway 29 at Fairway Ave from May 1 at 9:01PM to May 2 at 6:01AM.
From: Fairway Ave to Wapoo Ave/Brannan St in Calistoga
In Saint Helena Lane #1 will be closed overnight for excavate & re-pave along Northbound Highway 29 at Bale Grist Mill from May 1 at 10:01PM to May 2 at 5:59AM.
From: Bale Grist Mill to Big Tree Rd in Saint Helena
In Saint Helena The right shoulder will be closed for excavate & re-pave along Northbound Highway 29 at Lodi Lane from May 2 at 7:01AM to May 2 at 4:59PM.
In Hidden Valley Lake The right shoulder will be closed for landscape work along North / southbound Highway 29 at from May 2 at 8:01AM to May 2 at 4:01PM.
From: in Hidden Valley Lake to in Lower Lake 0.4 mi South of Spruce Grove Rd South
In Vallejo The left shoulder, and the right shoulder will be closed for concrete pavement along North / southbound Highway 29 at from May 2 at 9:01AM to May 2 at 3:01PM.
From: to in Vallejo Before intersection of Meadows Drive