In Yreka Lane #1, the left shoulder, and the right shoulder will be closed for drainage work along North / southbound Highway 3 at Turre St from May 6 at 6:30AM to May 6 at 7:30PM.
In Yreka Lane #1, the left shoulder, and the right shoulder will be closed for drainage work along North / southbound Highway 3 at Miner St from May 6 at 6:30AM to May 6 at 7:30PM.
In Yreka Lane #1, the left shoulder, and the right shoulder will be closed for drainage work along North / southbound Highway 3 at Turre St from May 7 at 6:30AM to May 7 at 7:30PM.
In Yreka Lane #1, the left shoulder, and the right shoulder will be closed for drainage work along North / southbound Highway 3 at Miner St from May 7 at 6:30AM to May 7 at 7:30PM.
In Weaverville Lane #2, and the right shoulder will be closed for utility work along Southbound Highway 3 at 1.7 mi north of Route 299 (Weaverville) from May 7 at 7:01AM to May 7 at 7:01PM.
From: 1.7 mi north of Route 299 (Weaverville) to 0.2 mi north of Route 299 (Weaverville) in Weaverville