Highway US-101 Lane Closures, Road Construction and Blocked Lanes

The following is a list of CalTrans lane closures, road construction, and blocked lanes that are active or plannded for on Highway US-101
 

CalTrans Lane & Road Closures US-101 South

101

South

Active

Full closure lasting 2 days on Off Ramp for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Ventura to Seacliff, Route 1 Ventura
View on Google Maps
ID: C101EA-0004-2022-12-02-19:01:00
Fri Dec 2 2022, 7:01PM
Mon Dec 5 2022, 5:59AM
101

South

Active

Full closure lasting 2 days on On Ramp for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Seacliff, Route 1 Ventura to Ventura Freeway, Route 101 Ventura
View on Google Maps
ID: C101EA-0005-2022-12-02-19:01:00
Fri Dec 2 2022, 7:01PM
Mon Dec 5 2022, 5:59AM
101

South

Lane closure lasting 13 hours on Mainline for Falsework Removal affecting #1, #2 lane(s) in District: 4

From: Todd Rd Santa Rosa to Todd Rd Santa Rosa 0.25 Miles North of Todd Rd Overcrossing
View on Google Maps
ID: C101VB-0002-2022-12-03-20:01:00
Sat Dec 3 2022, 8:01PM
Sun Dec 4 2022, 8:59AM
101

South

Lane closure lasting 12 hours on Mainline for Falsework Installation affecting #1, #2 lane(s) in District: 4

From: Baker Ave Santa Rosa to Baker Ave Santa Rosa
View on Google Maps
ID: C101VB-0008-2022-12-03-20:01:00
Sat Dec 3 2022, 8:01PM
Sun Dec 4 2022, 7:59AM
101

South

Lane closure lasting 11 hours on Mainline for Paving Operation affecting #2 lane(s) in District: 7

From: Mussel Shoals/Ocean Dr Ventura to State Beaches Ventura
View on Google Maps
ID: C101EA-0006-2022-12-03-22:01:00
Sat Dec 3 2022, 10:01PM
Sun Dec 4 2022, 8:59AM
101

South

Lane closure lasting 7 hours on Mainline for K-Rail Installation affecting #4, #5 lane(s) in District: 7

From: White Oak Ave Encino to White Oak Ave Encino
View on Google Maps
ID: C101OB-0008-2022-12-04-00:01:00
Sun Dec 4 2022, 12:01AM
Sun Dec 4 2022, 6:59AM
101

South

Traffic Break closure lasting 2 hours on Mainline for Utility Work affecting All lane(s) in District: 4

From: Anderson Dr San Rafael to Anderson Dr San Rafael
View on Google Maps
ID: P101NB-0004-2022-12-04-07:01:00
Sun Dec 4 2022, 7:01AM
Sun Dec 4 2022, 9:01AM
101

South

Lane closure lasting 3 hours on Mainline for Pavement Repair affecting #2, #3 lane(s) in District: 5

From: Betteravia Road Santa Maria to Santa Maria Way UC/BR 51 0071 Santa Maria
View on Google Maps
ID: S101JA-0001-2022-12-04-21:01:00
Sun Dec 4 2022, 9:01PM
Mon Dec 5 2022, 12:01AM
101

South

Lane closure lasting 12 hours on Mainline for Paving Operation affecting #2 lane(s) in District: 7

From: Mussel Shoals/Ocean Dr Ventura to State Beaches Ventura
View on Google Maps
ID: C101EA-0007-2022-12-04-21:01:00
Sun Dec 4 2022, 9:01PM
Mon Dec 5 2022, 8:59AM
101

South

Lane closure lasting 9 hours on Mainline for Demolition Work affecting #1 lane(s) in District: 7

From: Havenhurst Ave Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0090-2022-12-04-21:01:12
Sun Dec 4 2022, 9:01PM
Mon Dec 5 2022, 5:59AM
101

South

Lane closure lasting 9 hours on Mainline for Road Survey affecting #1 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0105-2022-12-04-21:01:32
Sun Dec 4 2022, 9:01PM
Mon Dec 5 2022, 5:59AM
101

South

Lane closure lasting 9 hours on Mainline for Road Survey affecting #1 lane(s) in District: 7

From: Mulholland Dr / Valley Circle Blvd Woodland Hills to Topanga Canyon Blvd, Route 27 Woodland Hills
View on Google Maps
ID: C101OA-0145-2022-12-04-21:01:39
Sun Dec 4 2022, 9:01PM
Mon Dec 5 2022, 5:59AM
101

South

Lane closure lasting 9 hours on Mainline for Road Survey affecting #1, #2 lane(s) in District: 7

From: Mulholland Dr / Valley Circle Blvd Woodland Hills to Topanga Canyon Blvd, Route 27 Woodland Hills
View on Google Maps
ID: C101OA-0150-2022-12-04-21:01:49
Sun Dec 4 2022, 9:01PM
Mon Dec 5 2022, 5:59AM
101

South

Alternating Lanes closure lasting 9 hours on Mainline for Miscellaneous Work affecting #1, #2 lane(s) in District: 5

From: Sheffield Drive Santa Barbara to Padaro Lane SB Off-Ramp Summerland
View on Google Maps
ID: C101KB-0006-2022-12-04-22:01:00
Sun Dec 4 2022, 10:01PM
Mon Dec 5 2022, 6:59AM
101

South

Full closure lasting 9 hours on On Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Evans Avenue Summerland to Route 101 Summerland
View on Google Maps
ID: C101KB-0011-2022-12-04-22:01:00
Sun Dec 4 2022, 10:01PM
Mon Dec 5 2022, 6:59AM
101

South

Full closure lasting 9 hours on On Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Sheffield Drive Santa Barbara to Route 101 Santa Barbara
View on Google Maps
ID: C101KB-0016-2022-12-04-22:01:00
Sun Dec 4 2022, 10:01PM
Mon Dec 5 2022, 6:59AM
101

South

Full closure lasting 9 hours on Off Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Route 101 Santa Barbara to Sheffield Drive Santa Barbara
View on Google Maps
ID: C101KB-0021-2022-12-04-22:01:00
Sun Dec 4 2022, 10:01PM
Mon Dec 5 2022, 6:59AM
101

South

Full closure lasting 9 hours on Off Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Route 101 Summerland to Padaro Lane SB Off-Ramp Summerland
View on Google Maps
ID: C101UB-0001-2022-12-04-22:01:00
Sun Dec 4 2022, 10:01PM
Mon Dec 5 2022, 6:59AM
101

South

Alternating Lanes closure lasting 9 hours on Mainline for Miscellaneous Work affecting #1, #2 lane(s) in District: 5

From: Padaro Lane SB Off-Ramp Summerland to Carpinteria Avenue SB Off-Ramp Carpinteria
View on Google Maps
ID: C101UB-0008-2022-12-04-22:01:00
Sun Dec 4 2022, 10:01PM
Mon Dec 5 2022, 6:59AM
101

South

Lane closure lasting 8 hours on Mainline for Demolition Work affecting #1 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Woodman Ave Sherman Oaks
View on Google Maps
ID: C101OA-0040-2022-12-04-22:01:02
Sun Dec 4 2022, 10:01PM
Mon Dec 5 2022, 5:59AM
101

South

Lane closure lasting 7 hours on Mainline for Demolition Work affecting #1, #2 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Woodman Ave Sherman Oaks
View on Google Maps
ID: C101OA-0045-2022-12-04-22:01:18
Sun Dec 4 2022, 10:01PM
Mon Dec 5 2022, 4:59AM
101

South

Lane closure lasting 8 hours on Mainline for Demolition Work affecting #1 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Hollywood Freeway, Route 170 North Hollywood
View on Google Maps
ID: C101OA-0180-2022-12-04-22:01:42
Sun Dec 4 2022, 10:01PM
Mon Dec 5 2022, 5:59AM
101

South

Lane closure lasting 8 hours on Mainline for Road Survey affecting #1, #2 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0110-2022-12-04-22:01:45
Sun Dec 4 2022, 10:01PM
Mon Dec 5 2022, 5:59AM
101

South

Full closure lasting 8 hours on Connector for Striping Operation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0165-2022-12-04-22:01:56
Sun Dec 4 2022, 10:01PM
Mon Dec 5 2022, 5:59AM
101

South

Lane closure lasting 7 hours on Mainline for Demolition Work affecting #1, #2 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Hollywood Freeway, Route 170 North Hollywood
View on Google Maps
ID: C101OA-0185-2022-12-04-22:01:56
Sun Dec 4 2022, 10:01PM
Mon Dec 5 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Road Survey affecting #1, #2, #3 lane(s) in District: 7

From: Mulholland Dr / Valley Circle Blvd Woodland Hills to Topanga Canyon Blvd, Route 27 Woodland Hills
View on Google Maps
ID: C101OA-0155-2022-12-04-23:01:00
Sun Dec 4 2022, 11:01PM
Mon Dec 5 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Demolition Work affecting #1, #2 lane(s) in District: 7

From: Havenhurst Ave Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0095-2022-12-04-23:01:28
Sun Dec 4 2022, 11:01PM
Mon Dec 5 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Road Survey affecting #1, #2, #3 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0115-2022-12-04-23:01:55
Sun Dec 4 2022, 11:01PM
Mon Dec 5 2022, 4:59AM
101

South

Lane closure lasting 4 hours on Mainline for Road Survey affecting #1, #2, #3, #4 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0120-2022-12-04-23:59:04
Sun Dec 4 2022, 11:59PM
Mon Dec 5 2022, 3:59AM
101

South

Lane closure lasting 5 hours on Mainline for Demolition Work affecting #1, #2, #3 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Hollywood Freeway, Route 170 North Hollywood
View on Google Maps
ID: C101OA-0190-2022-12-04-23:59:17
Sun Dec 4 2022, 11:59PM
Mon Dec 5 2022, 4:59AM
101

South

Lane closure lasting 5 hours on Mainline for Demolition Work affecting #1, #2, #3 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Woodman Ave Sherman Oaks
View on Google Maps
ID: C101OA-0050-2022-12-04-23:59:39
Sun Dec 4 2022, 11:59PM
Mon Dec 5 2022, 4:59AM
101

South

Lane closure lasting 4 hours on Mainline for Demolition Work affecting #1, #2, #3 lane(s) in District: 7

From: Havenhurst Ave Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0100-2022-12-04-23:59:39
Sun Dec 4 2022, 11:59PM
Mon Dec 5 2022, 3:59AM
101

South

Lane closure lasting 10 hours on Mainline for Median Barrier Work affecting #1 lane(s) in District: 5

From: Teague Avenue King City to Jolon Road (Southbound) King City
View on Google Maps
ID: C101CG-0001-2022-12-05-04:30:32
Mon Dec 5 2022, 4:30AM
Mon Dec 5 2022, 2:59PM
101

South

Lane closure lasting 10 hours on Conventional Hwy for Drainage Work affecting #2, Right Shoulder lane(s) in District: 1

From: Moss Cove Rest Area - Southbound Willits to Willits
View on Google Maps
ID: C101OA-0001-2022-12-05-07:01:00
Mon Dec 5 2022, 7:01AM
Mon Dec 5 2022, 5:01PM
101

South

Lane closure lasting 9 hours on Conventional Hwy for Fence Work affecting Right Shoulder lane(s) in District: 1

From: Presswood Overhead Bridge Ukiah to East Perkins St Overcrossing Ukiah
View on Google Maps
ID: C101UB-0011-2022-12-05-07:30:27
Mon Dec 5 2022, 7:30AM
Mon Dec 5 2022, 4:01PM
101

South

Full closure lasting 8 hours on On Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Canal Street King City to Route 101 King City
View on Google Maps
ID: C101CG-0015-2022-12-05-08:01:29
Mon Dec 5 2022, 8:01AM
Mon Dec 5 2022, 3:59PM
101

South

Full closure lasting 6 hours on Off Ramp for Bridge Construction affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0023-2022-12-05-09:01:00
Mon Dec 5 2022, 9:01AM
Mon Dec 5 2022, 2:59PM
101

South

Full closure lasting 6 hours on On Ramp for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Seacliff, Route 1 Ventura to Ventura Freeway, Route 101 Ventura
View on Google Maps
ID: C101EA-0011-2022-12-05-09:01:15
Mon Dec 5 2022, 9:01AM
Mon Dec 5 2022, 2:59PM
101

South

Lane closure lasting 6 hours on Mainline for Landscape Work affecting #1 lane(s) in District: 5

From: Fairview Avenue Goleta to Turnpike Road Santa Barbara
View on Google Maps
ID: M101SA-0004-2022-12-05-09:01:27
Mon Dec 5 2022, 9:01AM
Mon Dec 5 2022, 3:01PM
101

South

Full closure lasting 6 hours on Off Ramp for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Ventura to Seacliff, Route 1 Ventura
View on Google Maps
ID: C101EA-0017-2022-12-05-09:01:38
Mon Dec 5 2022, 9:01AM
Mon Dec 5 2022, 2:59PM
101

South

Full closure lasting 6 hours on On Ramp for Landscape Work affecting All lane(s) in District: 5

From: Patterson Avenue Santa Barbara to Route 101 Santa Barbara
View on Google Maps
ID: M101SA-0006-2022-12-05-09:01:52
Mon Dec 5 2022, 9:01AM
Mon Dec 5 2022, 3:01PM
101

South

Lane closure lasting 6 hours on Mainline for Tree Work affecting #4 lane(s) in District: 4

From: Waldo Sausalito to North End of Waldo Tunnel Sausalito
View on Google Maps
ID: N101EA-0001-2022-12-05-10:01:00
Mon Dec 5 2022, 10:01AM
Mon Dec 5 2022, 4:01PM
101

South

Full closure lasting 11 hours on Off Ramp for Bridge Construction affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0024-2022-12-05-19:01:00
Mon Dec 5 2022, 7:01PM
Tue Dec 6 2022, 5:59AM
101

South

Full closure lasting 11 hours on Off Ramp for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Ventura to Seacliff, Route 1 Ventura
View on Google Maps
ID: C101EA-0020-2022-12-05-19:01:02
Mon Dec 5 2022, 7:01PM
Tue Dec 6 2022, 5:59AM
101

South

Full closure lasting 11 hours on On Ramp for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Seacliff, Route 1 Ventura to Ventura Freeway, Route 101 Ventura
View on Google Maps
ID: C101EA-0014-2022-12-05-19:01:46
Mon Dec 5 2022, 7:01PM
Tue Dec 6 2022, 5:59AM
101

South

Lane closure lasting 9 hours on Mainline for Falsework Installation affecting #2, #3 lane(s) in District: 4

From: Baker Ave Santa Rosa to Baker Ave Santa Rosa
View on Google Maps
ID: C101VB-0012-2022-12-05-20:01:00
Mon Dec 5 2022, 8:01PM
Tue Dec 6 2022, 4:59AM
101

South

Lane closure lasting 9 hours on Toll Bridge for Bridge Construction affecting #1, #2, #3 lane(s) in District: 4

From: Monte Mar/Spencer Ave Sausalito to Golden Gate Br South Tower San Francisco
View on Google Maps
ID: P101LB-0013-2022-12-05-20:01:00
Mon Dec 5 2022, 8:01PM
Tue Dec 6 2022, 4:59AM
101

South

Full closure lasting 11 hours on On Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Evans Avenue Summerland to Route 101 Summerland
View on Google Maps
ID: C101KB-0012-2022-12-05-20:01:00
Mon Dec 5 2022, 8:01PM
Tue Dec 6 2022, 6:59AM
101

South

Full closure lasting 11 hours on On Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Sheffield Drive Santa Barbara to Route 101 Santa Barbara
View on Google Maps
ID: C101KB-0017-2022-12-05-20:01:00
Mon Dec 5 2022, 8:01PM
Tue Dec 6 2022, 6:59AM
101

South

Lane closure lasting 10 hours on Mainline for Bridge Construction affecting #1 lane(s) in District: 7

From: Cheesebro Rd / Palo Camado Canyon Rd Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0025-2022-12-05-20:01:00
Mon Dec 5 2022, 8:01PM
Tue Dec 6 2022, 5:59AM
101

South

Lane closure lasting 10 hours on Mainline for Bridge Construction affecting #4 lane(s) in District: 7

From: Cheesebro Rd / Palo Camado Canyon Rd Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0028-2022-12-05-20:01:00
Mon Dec 5 2022, 8:01PM
Tue Dec 6 2022, 5:59AM
101

South

Full closure lasting 11 hours on Off Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Route 101 Santa Barbara to Sheffield Drive Santa Barbara
View on Google Maps
ID: C101KB-0022-2022-12-05-20:01:14
Mon Dec 5 2022, 8:01PM
Tue Dec 6 2022, 6:59AM
101

South

Lane closure lasting 14 hours on Mainline for Bridge Construction affecting #1 lane(s) in District: 4

From: Tar Spring Creek Gilroy to Sargent Bridge Overhead Gilroy
View on Google Maps
ID: C101KB-0014-2022-12-05-20:01:58
Mon Dec 5 2022, 8:01PM
Tue Dec 6 2022, 9:59AM
101

South

Alternating Lanes closure lasting 10 hours on Mainline for Miscellaneous Work affecting #1, #2 lane(s) in District: 5

From: Padaro Lane SB Off-Ramp Summerland to Carpinteria Avenue SB Off-Ramp Carpinteria
View on Google Maps
ID: C101UB-0009-2022-12-05-21:01:00
Mon Dec 5 2022, 9:01PM
Tue Dec 6 2022, 6:59AM
101

South

Full closure lasting 9 hours on Off Ramp for Shoulder Work affecting All lane(s) in District: 7

From: Hollywood Freeway, Route 101 Los Angeles to Sunset Blvd Los Angeles
View on Google Maps
ID: C101GB-0006-2022-12-05-21:01:00
Mon Dec 5 2022, 9:01PM
Tue Dec 6 2022, 6:01AM
101

South

Full closure lasting 9 hours on Off Ramp for Shoulder Work affecting All lane(s) in District: 7

From: Hollywood Freeway, Route 101 Los Angeles to Hollywood Blvd Los Angeles
View on Google Maps
ID: C101GB-0010-2022-12-05-21:01:00
Mon Dec 5 2022, 9:01PM
Tue Dec 6 2022, 6:01AM
101

South

Full closure lasting 8 hours on On Ramp for Shoulder Work affecting All lane(s) in District: 7

From: Hollywood Blvd Los Angeles to Hollywood Freeway, Route 101 Los Angeles
View on Google Maps
ID: C101GB-0014-2022-12-05-21:01:00
Mon Dec 5 2022, 9:01PM
Tue Dec 6 2022, 5:01AM
101

South

Lane closure lasting 8 hours on Mainline for Shoulder Work affecting #4 lane(s) in District: 7

From: Highland Ave Los Angeles to Sunset Blvd Los Angeles
View on Google Maps
ID: C101GB-0018-2022-12-05-21:01:00
Mon Dec 5 2022, 9:01PM
Tue Dec 6 2022, 5:01AM
101

South

Alternating Lanes closure lasting 10 hours on Mainline for Miscellaneous Work affecting #1, #2 lane(s) in District: 5

From: Sheffield Drive Santa Barbara to Padaro Lane SB Off-Ramp Summerland
View on Google Maps
ID: C101KB-0007-2022-12-05-21:01:11
Mon Dec 5 2022, 9:01PM
Tue Dec 6 2022, 6:59AM
101

South

Full closure lasting 8 hours on On Ramp for Bridge Construction affecting All lane(s) in District: 4

From: De La Cruz Bl Oc San Jose to Route 101 San Jose SB Loop On-Ramp from SB De La Cruz Blvd.
View on Google Maps
ID: C101QC-0028-2022-12-05-21:01:12
Mon Dec 5 2022, 9:01PM
Tue Dec 6 2022, 4:59AM
101

South

Lane closure lasting 9 hours on Mainline for Demolition Work affecting #1 lane(s) in District: 7

From: Havenhurst Ave Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0091-2022-12-05-21:01:12
Mon Dec 5 2022, 9:01PM
Tue Dec 6 2022, 5:59AM
101

South

Full closure lasting 8 hours on Off Ramp for K-rail Installation affecting All lane(s) in District: 4

From: Route 101 San Jose to De La Cruz Bl Oc San Jose SB Diagonal Off-Ramp to SB De La Cruz Blvd.
View on Google Maps
ID: C101QC-0032-2022-12-05-21:01:13
Mon Dec 5 2022, 9:01PM
Tue Dec 6 2022, 4:59AM
101

South

Lane closure lasting 13 hours on Mainline for Bridge Construction affecting #2 lane(s) in District: 4

From: Route 101 Gilroy to Route 101 Gilroy
View on Google Maps
ID: C101KB-0010-2022-12-05-21:01:18
Mon Dec 5 2022, 9:01PM
Tue Dec 6 2022, 9:59AM
101

South

Lane closure lasting 8 hours on Mainline for Electrical Work affecting #1, #2 lane(s) in District: 4

From: Ralston Ave Belmont to Brittan Ave Redwood City
View on Google Maps
ID: C101XB-0026-2022-12-05-21:01:28
Mon Dec 5 2022, 9:01PM
Tue Dec 6 2022, 5:01AM
101

South

Lane closure lasting 9 hours on Mainline for Road Survey affecting #1 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0106-2022-12-05-21:01:32
Mon Dec 5 2022, 9:01PM
Tue Dec 6 2022, 5:59AM
101

South

Lane closure lasting 9 hours on Mainline for Road Survey affecting #1 lane(s) in District: 7

From: Mulholland Dr / Valley Circle Blvd Woodland Hills to Topanga Canyon Blvd, Route 27 Woodland Hills
View on Google Maps
ID: C101OA-0146-2022-12-05-21:01:39
Mon Dec 5 2022, 9:01PM
Tue Dec 6 2022, 5:59AM
101

South

Alternating Lanes closure lasting 8 hours on Mainline for Bridge Construction affecting #1, #2, #3 lane(s) in District: 4

From: Route 237 Sunnyvale to Mathilda Ave Sunnyvale
View on Google Maps
ID: C101KB-0030-2022-12-05-21:01:44
Mon Dec 5 2022, 9:01PM
Tue Dec 6 2022, 4:59AM
101

South

Lane closure lasting 9 hours on Mainline for Road Survey affecting #1, #2 lane(s) in District: 7

From: Mulholland Dr / Valley Circle Blvd Woodland Hills to Topanga Canyon Blvd, Route 27 Woodland Hills
View on Google Maps
ID: C101OA-0151-2022-12-05-21:01:49
Mon Dec 5 2022, 9:01PM
Tue Dec 6 2022, 5:59AM
101

South

Lane closure lasting 6 hours on Mainline for Sign Work affecting #3 lane(s) in District: 4

From: Caulfield Lane OC Petaluma to Route 116/Lakeville Hwy Petaluma
View on Google Maps
ID: C101RA-0006-2022-12-05-22:01:00
Mon Dec 5 2022, 10:01PM
Tue Dec 6 2022, 3:59AM
101

South

Full closure lasting 8 hours on Off Ramp for Falsework Installation affecting All lane(s) in District: 4

From: Route 101 Santa Rosa to Baker Ave Santa Rosa 0.25 Miles North of Baker Overcrossing
View on Google Maps
ID: C101VB-0011-2022-12-05-22:01:00
Mon Dec 5 2022, 10:01PM
Tue Dec 6 2022, 5:59AM
101

South

Lane closure lasting 7 hours on Mainline for Bridge Construction affecting #1, #2 lane(s) in District: 7

From: Cheesebro Rd / Palo Camado Canyon Rd Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0026-2022-12-05-22:01:00
Mon Dec 5 2022, 10:01PM
Tue Dec 6 2022, 4:59AM
101

South

Lane closure lasting 7 hours on Mainline for Bridge Construction affecting #4, #3 lane(s) in District: 7

From: Cheesebro Rd / Palo Camado Canyon Rd Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0029-2022-12-05-22:01:00
Mon Dec 5 2022, 10:01PM
Tue Dec 6 2022, 4:59AM
101

South

Lane closure lasting 8 hours on Mainline for Demolition Work affecting #1 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Woodman Ave Sherman Oaks
View on Google Maps
ID: C101OA-0041-2022-12-05-22:01:02
Mon Dec 5 2022, 10:01PM
Tue Dec 6 2022, 5:59AM
101

South

Lane closure lasting 7 hours on Mainline for Demolition Work affecting #1, #2 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Woodman Ave Sherman Oaks
View on Google Maps
ID: C101OA-0046-2022-12-05-22:01:18
Mon Dec 5 2022, 10:01PM
Tue Dec 6 2022, 4:59AM
101

South

Lane closure lasting 7 hours on Mainline for Electrical Work affecting #1, #2 lane(s) in District: 4

From: 3rd/4th Ave San Mateo to Route 92 San Mateo
View on Google Maps
ID: C101XB-0012-2022-12-05-22:01:30
Mon Dec 5 2022, 10:01PM
Tue Dec 6 2022, 5:01AM
101

South

Alternating Lanes closure lasting 7 hours on Mainline for Survey Work affecting #4 lane(s) in District: 4

From: Oyster Point Blvd (East) South San Francisco to Butler Ave South San Francisco
View on Google Maps
ID: P101HB-0010-2022-12-05-22:01:41
Mon Dec 5 2022, 10:01PM
Tue Dec 6 2022, 5:01AM
101

South

Lane closure lasting 8 hours on Mainline for Demolition Work affecting #1 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Hollywood Freeway, Route 170 North Hollywood
View on Google Maps
ID: C101OA-0181-2022-12-05-22:01:42
Mon Dec 5 2022, 10:01PM
Tue Dec 6 2022, 5:59AM
101

South

Lane closure lasting 9 hours on Mainline for Bridge Construction affecting #1 lane(s) in District: 4

From: Tar Spring Creek Gilroy to Sargent Bridge Overhead Gilroy
View on Google Maps
ID: C101KB-0018-2022-12-05-22:01:43
Mon Dec 5 2022, 10:01PM
Tue Dec 6 2022, 6:59AM
101

South

Lane closure lasting 8 hours on Mainline for Road Survey affecting #1, #2 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0111-2022-12-05-22:01:45
Mon Dec 5 2022, 10:01PM
Tue Dec 6 2022, 5:59AM
101

South

Lane closure lasting 7 hours on Mainline for Electrical Work affecting #1, #2 lane(s) in District: 4

From: Broadway Burlingame to Anza Blvd Burlingame
View on Google Maps
ID: C101XB-0016-2022-12-05-22:01:54
Mon Dec 5 2022, 10:01PM
Tue Dec 6 2022, 5:01AM
101

South

Full closure lasting 8 hours on Connector for Striping Operation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0166-2022-12-05-22:01:56
Mon Dec 5 2022, 10:01PM
Tue Dec 6 2022, 5:59AM
101

South

Lane closure lasting 7 hours on Mainline for Demolition Work affecting #1, #2 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Hollywood Freeway, Route 170 North Hollywood
View on Google Maps
ID: C101OA-0186-2022-12-05-22:01:56
Mon Dec 5 2022, 10:01PM
Tue Dec 6 2022, 4:59AM
101

South

Full closure lasting 6 hours on Connector for Sign Work affecting All lane(s) in District: 4

From: Route 101 Petaluma to Route 116/Lakeville Hwy Petaluma
View on Google Maps
ID: C101RA-0001-2022-12-05-23:01:00
Mon Dec 5 2022, 11:01PM
Tue Dec 6 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Bridge Painting affecting #1 lane(s) in District: 4

From: Market Street / Octavia Street San Francisco to South Bound Connector Off-Ramp to East Bound i80 San Francisco
View on Google Maps
ID: C101XA-0005-2022-12-05-23:01:00
Mon Dec 5 2022, 11:01PM
Tue Dec 6 2022, 4:59AM
101

South

Lane closure lasting 5 hours on Mainline for Bridge Construction affecting #1, #2, #3 lane(s) in District: 7

From: Cheesebro Rd / Palo Camado Canyon Rd Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0027-2022-12-05-23:01:00
Mon Dec 5 2022, 11:01PM
Tue Dec 6 2022, 3:59AM
101

South

Lane closure lasting 5 hours on Mainline for Bridge Construction affecting #2, #3, #4 lane(s) in District: 7

From: Cheesebro Rd / Palo Camado Canyon Rd Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0030-2022-12-05-23:01:00
Mon Dec 5 2022, 11:01PM
Tue Dec 6 2022, 3:59AM
101

South

Lane closure lasting 6 hours on Mainline for Road Survey affecting #1, #2, #3 lane(s) in District: 7

From: Mulholland Dr / Valley Circle Blvd Woodland Hills to Topanga Canyon Blvd, Route 27 Woodland Hills
View on Google Maps
ID: C101OA-0156-2022-12-05-23:01:00
Mon Dec 5 2022, 11:01PM
Tue Dec 6 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Demolition Work affecting #1, #2 lane(s) in District: 7

From: Havenhurst Ave Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0096-2022-12-05-23:01:28
Mon Dec 5 2022, 11:01PM
Tue Dec 6 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Bridge Construction affecting #1 lane(s) in District: 4

From: Santa Clara to De La Cruz Bl Oc Santa Clara SB Route 101 at Trimble Road/De La Cruz Blvd.
View on Google Maps
ID: C101QC-0020-2022-12-05-23:01:33
Mon Dec 5 2022, 11:01PM
Tue Dec 6 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Road Survey affecting #1, #2, #3 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0116-2022-12-05-23:01:55
Mon Dec 5 2022, 11:01PM
Tue Dec 6 2022, 4:59AM
101

South

Lane closure lasting 5 hours on Mainline for Shoulder Work affecting #3, #4 lane(s) in District: 7

From: Highland Ave Los Angeles to Sunset Blvd Los Angeles
View on Google Maps
ID: C101GB-0022-2022-12-05-23:59:00
Mon Dec 5 2022, 11:59PM
Tue Dec 6 2022, 5:01AM
101

South

Lane closure lasting 4 hours on Mainline for Road Survey affecting #1, #2, #3, #4 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0121-2022-12-05-23:59:04
Mon Dec 5 2022, 11:59PM
Tue Dec 6 2022, 3:59AM
101

South

Lane closure lasting 5 hours on Mainline for Demolition Work affecting #1, #2, #3 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Hollywood Freeway, Route 170 North Hollywood
View on Google Maps
ID: C101OA-0191-2022-12-05-23:59:17
Mon Dec 5 2022, 11:59PM
Tue Dec 6 2022, 4:59AM
101

South

Full closure lasting 5 hours on Connector for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 North Hollywood to Ventura Freeway, Route 134 North Hollywood
View on Google Maps
ID: C101TA-0002-2022-12-05-23:59:20
Mon Dec 5 2022, 11:59PM
Tue Dec 6 2022, 5:01AM
101

South

Lane closure lasting 5 hours on Mainline for Demolition Work affecting #1, #2, #3 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Woodman Ave Sherman Oaks
View on Google Maps
ID: C101OA-0051-2022-12-05-23:59:39
Mon Dec 5 2022, 11:59PM
Tue Dec 6 2022, 4:59AM
101

South

Lane closure lasting 4 hours on Mainline for Demolition Work affecting #1, #2, #3 lane(s) in District: 7

From: Havenhurst Ave Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0101-2022-12-05-23:59:39
Mon Dec 5 2022, 11:59PM
Tue Dec 6 2022, 3:59AM
101

South

Lane closure lasting 10 hours on Mainline for Median Barrier Work affecting #1 lane(s) in District: 5

From: Teague Avenue King City to Jolon Road (Southbound) King City
View on Google Maps
ID: C101CG-0002-2022-12-06-04:30:32
Tue Dec 6 2022, 4:30AM
Tue Dec 6 2022, 2:59PM
101

South

Lane closure lasting 10 hours on Conventional Hwy for Drainage Work affecting #2, Right Shoulder lane(s) in District: 1

From: Moss Cove Rest Area - Southbound Willits to Willits
View on Google Maps
ID: C101OA-0002-2022-12-06-07:01:00
Tue Dec 6 2022, 7:01AM
Tue Dec 6 2022, 5:01PM
101

South

Lane closure lasting 9 hours on Conventional Hwy for Fence Work affecting Right Shoulder lane(s) in District: 1

From: Presswood Overhead Bridge Ukiah to East Perkins St Overcrossing Ukiah
View on Google Maps
ID: C101UB-0012-2022-12-06-07:30:27
Tue Dec 6 2022, 7:30AM
Tue Dec 6 2022, 4:01PM
101

South

Full closure lasting 8 hours on On Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Canal Street King City to Route 101 King City
View on Google Maps
ID: C101CG-0016-2022-12-06-08:01:29
Tue Dec 6 2022, 8:01AM
Tue Dec 6 2022, 3:59PM
101

South

Full closure lasting 8 hours on On Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Jolon Road (Southbound) King City to Route 101 King City
View on Google Maps
ID: C101CG-0028-2022-12-06-08:01:57
Tue Dec 6 2022, 8:01AM
Tue Dec 6 2022, 3:59PM
101

South

Full closure lasting 6 hours on Off Ramp for Bridge Construction affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0039-2022-12-06-09:01:00
Tue Dec 6 2022, 9:01AM
Tue Dec 6 2022, 2:59PM
101

South

Full closure lasting 6 hours on Off Ramp for Guardrail Repair affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Newbury Park to Wendy Dr Newbury Park
View on Google Maps
ID: W101PA-0001-2022-12-06-09:01:00
Tue Dec 6 2022, 9:01AM
Tue Dec 6 2022, 3:01PM
101

South

Full closure lasting 6 hours on On Ramp for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Seacliff, Route 1 Ventura to Ventura Freeway, Route 101 Ventura
View on Google Maps
ID: C101EA-0012-2022-12-06-09:01:15
Tue Dec 6 2022, 9:01AM
Tue Dec 6 2022, 2:59PM
101

South

Lane closure lasting 6 hours on Mainline for Landscape Work affecting #1 lane(s) in District: 5

From: Fairview Avenue Goleta to Turnpike Road Santa Barbara
View on Google Maps
ID: M101SA-0005-2022-12-06-09:01:27
Tue Dec 6 2022, 9:01AM
Tue Dec 6 2022, 3:01PM
101

South

Full closure lasting 6 hours on Off Ramp for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Ventura to Seacliff, Route 1 Ventura
View on Google Maps
ID: C101EA-0018-2022-12-06-09:01:38
Tue Dec 6 2022, 9:01AM
Tue Dec 6 2022, 2:59PM
101

South

Full closure lasting 6 hours on On Ramp for Landscape Work affecting All lane(s) in District: 5

From: Patterson Avenue Santa Barbara to Route 101 Santa Barbara
View on Google Maps
ID: M101SA-0007-2022-12-06-09:01:52
Tue Dec 6 2022, 9:01AM
Tue Dec 6 2022, 3:01PM
101

South

Lane closure lasting 6 hours on Mainline for Tree Work affecting #4 lane(s) in District: 4

From: Waldo Sausalito to North End of Waldo Tunnel Sausalito
View on Google Maps
ID: N101EA-0002-2022-12-06-10:01:00
Tue Dec 6 2022, 10:01AM
Tue Dec 6 2022, 4:01PM
101

South

Full closure lasting 11 hours on Off Ramp for Bridge Construction affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0040-2022-12-06-19:01:00
Tue Dec 6 2022, 7:01PM
Wed Dec 7 2022, 5:59AM
101

South

Full closure lasting 11 hours on Off Ramp for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Ventura to Seacliff, Route 1 Ventura
View on Google Maps
ID: C101EA-0021-2022-12-06-19:01:02
Tue Dec 6 2022, 7:01PM
Wed Dec 7 2022, 5:59AM
101

South

Full closure lasting 11 hours on On Ramp for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Seacliff, Route 1 Ventura to Ventura Freeway, Route 101 Ventura
View on Google Maps
ID: C101EA-0015-2022-12-06-19:01:46
Tue Dec 6 2022, 7:01PM
Wed Dec 7 2022, 5:59AM
101

South

Lane closure lasting 9 hours on Mainline for Falsework Installation affecting #2, #3 lane(s) in District: 4

From: Baker Ave Santa Rosa to Baker Ave Santa Rosa
View on Google Maps
ID: C101VB-0016-2022-12-06-20:01:00
Tue Dec 6 2022, 8:01PM
Wed Dec 7 2022, 4:59AM
101

South

Lane closure lasting 9 hours on Toll Bridge for Bridge Construction affecting #1, #2, #3 lane(s) in District: 4

From: Monte Mar/Spencer Ave Sausalito to Golden Gate Br South Tower San Francisco
View on Google Maps
ID: P101LB-0014-2022-12-06-20:01:00
Tue Dec 6 2022, 8:01PM
Wed Dec 7 2022, 4:59AM
101

South

Full closure lasting 11 hours on On Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Evans Avenue Summerland to Route 101 Summerland
View on Google Maps
ID: C101KB-0013-2022-12-06-20:01:00
Tue Dec 6 2022, 8:01PM
Wed Dec 7 2022, 6:59AM
101

South

Full closure lasting 11 hours on On Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Sheffield Drive Santa Barbara to Route 101 Santa Barbara
View on Google Maps
ID: C101KB-0018-2022-12-06-20:01:00
Tue Dec 6 2022, 8:01PM
Wed Dec 7 2022, 6:59AM
101

South

Lane closure lasting 10 hours on Mainline for Bridge Construction affecting #1 lane(s) in District: 7

From: Cheesebro Rd / Palo Camado Canyon Rd Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0041-2022-12-06-20:01:00
Tue Dec 6 2022, 8:01PM
Wed Dec 7 2022, 5:59AM
101

South

Lane closure lasting 10 hours on Mainline for Bridge Construction affecting #4 lane(s) in District: 7

From: Cheesebro Rd / Palo Camado Canyon Rd Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0083-2022-12-06-20:01:00
Tue Dec 6 2022, 8:01PM
Wed Dec 7 2022, 5:59AM
101

South

Full closure lasting 11 hours on Off Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Route 101 Santa Barbara to Sheffield Drive Santa Barbara
View on Google Maps
ID: C101KB-0023-2022-12-06-20:01:14
Tue Dec 6 2022, 8:01PM
Wed Dec 7 2022, 6:59AM
101

South

Lane closure lasting 14 hours on Mainline for Bridge Construction affecting #1 lane(s) in District: 4

From: Tar Spring Creek Gilroy to Sargent Bridge Overhead Gilroy
View on Google Maps
ID: C101KB-0015-2022-12-06-20:01:58
Tue Dec 6 2022, 8:01PM
Wed Dec 7 2022, 9:59AM
101

South

Alternating Lanes closure lasting 10 hours on Mainline for Miscellaneous Work affecting #1, #2 lane(s) in District: 5

From: Padaro Lane SB Off-Ramp Summerland to Carpinteria Avenue SB Off-Ramp Carpinteria
View on Google Maps
ID: C101UB-0010-2022-12-06-21:01:00
Tue Dec 6 2022, 9:01PM
Wed Dec 7 2022, 6:59AM
101

South

Full closure lasting 9 hours on Off Ramp for Shoulder Work affecting All lane(s) in District: 7

From: Hollywood Freeway, Route 101 Los Angeles to Sunset Blvd Los Angeles
View on Google Maps
ID: C101GB-0007-2022-12-06-21:01:00
Tue Dec 6 2022, 9:01PM
Wed Dec 7 2022, 6:01AM
101

South

Full closure lasting 9 hours on Off Ramp for Shoulder Work affecting All lane(s) in District: 7

From: Hollywood Freeway, Route 101 Los Angeles to Hollywood Blvd Los Angeles
View on Google Maps
ID: C101GB-0011-2022-12-06-21:01:00
Tue Dec 6 2022, 9:01PM
Wed Dec 7 2022, 6:01AM
101

South

Full closure lasting 8 hours on On Ramp for Shoulder Work affecting All lane(s) in District: 7

From: Hollywood Blvd Los Angeles to Hollywood Freeway, Route 101 Los Angeles
View on Google Maps
ID: C101GB-0015-2022-12-06-21:01:00
Tue Dec 6 2022, 9:01PM
Wed Dec 7 2022, 5:01AM
101

South

Lane closure lasting 8 hours on Mainline for Shoulder Work affecting #4 lane(s) in District: 7

From: Highland Ave Los Angeles to Sunset Blvd Los Angeles
View on Google Maps
ID: C101GB-0019-2022-12-06-21:01:00
Tue Dec 6 2022, 9:01PM
Wed Dec 7 2022, 5:01AM
101

South

Alternating Lanes closure lasting 10 hours on Mainline for Miscellaneous Work affecting #1, #2 lane(s) in District: 5

From: Sheffield Drive Santa Barbara to Padaro Lane SB Off-Ramp Summerland
View on Google Maps
ID: C101KB-0008-2022-12-06-21:01:11
Tue Dec 6 2022, 9:01PM
Wed Dec 7 2022, 6:59AM
101

South

Full closure lasting 8 hours on On Ramp for Bridge Construction affecting All lane(s) in District: 4

From: De La Cruz Bl Oc San Jose to Route 101 San Jose SB Loop On-Ramp from SB De La Cruz Blvd.
View on Google Maps
ID: C101QC-0029-2022-12-06-21:01:12
Tue Dec 6 2022, 9:01PM
Wed Dec 7 2022, 4:59AM
101

South

Lane closure lasting 9 hours on Mainline for Demolition Work affecting #1 lane(s) in District: 7

From: Havenhurst Ave Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0092-2022-12-06-21:01:12
Tue Dec 6 2022, 9:01PM
Wed Dec 7 2022, 5:59AM
101

South

Full closure lasting 8 hours on Off Ramp for K-rail Installation affecting All lane(s) in District: 4

From: Route 101 San Jose to De La Cruz Bl Oc San Jose SB Diagonal Off-Ramp to SB De La Cruz Blvd.
View on Google Maps
ID: C101QC-0033-2022-12-06-21:01:13
Tue Dec 6 2022, 9:01PM
Wed Dec 7 2022, 4:59AM
101

South

Lane closure lasting 13 hours on Mainline for Bridge Construction affecting #2 lane(s) in District: 4

From: Route 101 Gilroy to Route 101 Gilroy
View on Google Maps
ID: C101KB-0011-2022-12-06-21:01:18
Tue Dec 6 2022, 9:01PM
Wed Dec 7 2022, 9:59AM
101

South

Lane closure lasting 8 hours on Mainline for Electrical Work affecting #1, #2 lane(s) in District: 4

From: Ralston Ave Belmont to Brittan Ave Redwood City
View on Google Maps
ID: C101XB-0027-2022-12-06-21:01:28
Tue Dec 6 2022, 9:01PM
Wed Dec 7 2022, 5:01AM
101

South

Lane closure lasting 9 hours on Mainline for Road Survey affecting #1 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0107-2022-12-06-21:01:32
Tue Dec 6 2022, 9:01PM
Wed Dec 7 2022, 5:59AM
101

South

Lane closure lasting 9 hours on Mainline for Road Survey affecting #1 lane(s) in District: 7

From: Mulholland Dr / Valley Circle Blvd Woodland Hills to Topanga Canyon Blvd, Route 27 Woodland Hills
View on Google Maps
ID: C101OA-0147-2022-12-06-21:01:39
Tue Dec 6 2022, 9:01PM
Wed Dec 7 2022, 5:59AM
101

South

Alternating Lanes closure lasting 8 hours on Mainline for Bridge Construction affecting #1, #2, #3 lane(s) in District: 4

From: Route 237 Sunnyvale to Mathilda Ave Sunnyvale
View on Google Maps
ID: C101KB-0031-2022-12-06-21:01:44
Tue Dec 6 2022, 9:01PM
Wed Dec 7 2022, 4:59AM
101

South

Lane closure lasting 9 hours on Mainline for Road Survey affecting #1, #2 lane(s) in District: 7

From: Mulholland Dr / Valley Circle Blvd Woodland Hills to Topanga Canyon Blvd, Route 27 Woodland Hills
View on Google Maps
ID: C101OA-0152-2022-12-06-21:01:49
Tue Dec 6 2022, 9:01PM
Wed Dec 7 2022, 5:59AM
101

South

Lane closure lasting 6 hours on Mainline for Sign Work affecting #3 lane(s) in District: 4

From: Caulfield Lane OC Petaluma to Route 116/Lakeville Hwy Petaluma
View on Google Maps
ID: C101RA-0007-2022-12-06-22:01:00
Tue Dec 6 2022, 10:01PM
Wed Dec 7 2022, 3:59AM
101

South

Full closure lasting 8 hours on Off Ramp for Falsework Installation affecting All lane(s) in District: 4

From: Route 101 Santa Rosa to Baker Ave Santa Rosa 0.25 Miles North of Baker Overcrossing
View on Google Maps
ID: C101VB-0015-2022-12-06-22:01:00
Tue Dec 6 2022, 10:01PM
Wed Dec 7 2022, 5:59AM
101

South

Lane closure lasting 7 hours on Mainline for Bridge Construction affecting #1, #2 lane(s) in District: 7

From: Cheesebro Rd / Palo Camado Canyon Rd Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0081-2022-12-06-22:01:00
Tue Dec 6 2022, 10:01PM
Wed Dec 7 2022, 4:59AM
101

South

Lane closure lasting 7 hours on Mainline for Bridge Construction affecting #3, #4 lane(s) in District: 7

From: Cheesebro Rd / Palo Camado Canyon Rd Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0084-2022-12-06-22:01:00
Tue Dec 6 2022, 10:01PM
Wed Dec 7 2022, 4:59AM
101

South

Lane closure lasting 8 hours on Mainline for Demolition Work affecting #1 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Woodman Ave Sherman Oaks
View on Google Maps
ID: C101OA-0042-2022-12-06-22:01:02
Tue Dec 6 2022, 10:01PM
Wed Dec 7 2022, 5:59AM
101

South

Lane closure lasting 7 hours on Mainline for Demolition Work affecting #1, #2 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Woodman Ave Sherman Oaks
View on Google Maps
ID: C101OA-0047-2022-12-06-22:01:18
Tue Dec 6 2022, 10:01PM
Wed Dec 7 2022, 4:59AM
101

South

Lane closure lasting 7 hours on Mainline for Electrical Work affecting #1, #2 lane(s) in District: 4

From: 3rd/4th Ave San Mateo to Route 92 San Mateo
View on Google Maps
ID: C101XB-0013-2022-12-06-22:01:30
Tue Dec 6 2022, 10:01PM
Wed Dec 7 2022, 5:01AM
101

South

Alternating Lanes closure lasting 7 hours on Mainline for Survey Work affecting #4 lane(s) in District: 4

From: Oyster Point Blvd (East) South San Francisco to Butler Ave South San Francisco
View on Google Maps
ID: P101HB-0011-2022-12-06-22:01:41
Tue Dec 6 2022, 10:01PM
Wed Dec 7 2022, 5:01AM
101

South

Lane closure lasting 8 hours on Mainline for Demolition Work affecting #1 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Hollywood Freeway, Route 170 North Hollywood
View on Google Maps
ID: C101OA-0182-2022-12-06-22:01:42
Tue Dec 6 2022, 10:01PM
Wed Dec 7 2022, 5:59AM
101

South

Lane closure lasting 9 hours on Mainline for Bridge Construction affecting #1 lane(s) in District: 4

From: Tar Spring Creek Gilroy to Sargent Bridge Overhead Gilroy
View on Google Maps
ID: C101KB-0019-2022-12-06-22:01:43
Tue Dec 6 2022, 10:01PM
Wed Dec 7 2022, 6:59AM
101

South

Lane closure lasting 8 hours on Mainline for Road Survey affecting #1, #2 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0112-2022-12-06-22:01:45
Tue Dec 6 2022, 10:01PM
Wed Dec 7 2022, 5:59AM
101

South

Lane closure lasting 7 hours on Mainline for Electrical Work affecting #1, #2 lane(s) in District: 4

From: Broadway Burlingame to Anza Blvd Burlingame
View on Google Maps
ID: C101XB-0017-2022-12-06-22:01:54
Tue Dec 6 2022, 10:01PM
Wed Dec 7 2022, 5:01AM
101

South

Full closure lasting 8 hours on Connector for Striping Operation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0167-2022-12-06-22:01:56
Tue Dec 6 2022, 10:01PM
Wed Dec 7 2022, 5:59AM
101

South

Lane closure lasting 7 hours on Mainline for Demolition Work affecting #1, #2 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Hollywood Freeway, Route 170 North Hollywood
View on Google Maps
ID: C101OA-0187-2022-12-06-22:01:56
Tue Dec 6 2022, 10:01PM
Wed Dec 7 2022, 4:59AM
101

South

Full closure lasting 6 hours on Connector for Sign Work affecting All lane(s) in District: 4

From: Route 101 Petaluma to Route 116/Lakeville Hwy Petaluma
View on Google Maps
ID: C101RA-0002-2022-12-06-23:01:00
Tue Dec 6 2022, 11:01PM
Wed Dec 7 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Bridge Painting affecting #1 lane(s) in District: 4

From: Market Street / Octavia Street San Francisco to South Bound Connector Off-Ramp to East Bound i80 San Francisco
View on Google Maps
ID: C101XA-0006-2022-12-06-23:01:00
Tue Dec 6 2022, 11:01PM
Wed Dec 7 2022, 4:59AM
101

South

Lane closure lasting 5 hours on Mainline for Bridge Construction affecting #1, #2, #3 lane(s) in District: 7

From: Cheesebro Rd / Palo Camado Canyon Rd Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0082-2022-12-06-23:01:00
Tue Dec 6 2022, 11:01PM
Wed Dec 7 2022, 3:59AM
101

South

Lane closure lasting 5 hours on Mainline for Bridge Construction affecting #2, #3, #4 lane(s) in District: 7

From: Cheesebro Rd / Palo Camado Canyon Rd Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0085-2022-12-06-23:01:00
Tue Dec 6 2022, 11:01PM
Wed Dec 7 2022, 3:59AM
101

South

Lane closure lasting 6 hours on Mainline for Road Survey affecting #1, #2, #3 lane(s) in District: 7

From: Mulholland Dr / Valley Circle Blvd Woodland Hills to Topanga Canyon Blvd, Route 27 Woodland Hills
View on Google Maps
ID: C101OA-0157-2022-12-06-23:01:00
Tue Dec 6 2022, 11:01PM
Wed Dec 7 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Demolition Work affecting #1, #2 lane(s) in District: 7

From: Havenhurst Ave Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0097-2022-12-06-23:01:28
Tue Dec 6 2022, 11:01PM
Wed Dec 7 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Bridge Construction affecting #1 lane(s) in District: 4

From: Santa Clara to De La Cruz Bl Oc Santa Clara SB Route 101 at Trimble Road/De La Cruz Blvd.
View on Google Maps
ID: C101QC-0021-2022-12-06-23:01:33
Tue Dec 6 2022, 11:01PM
Wed Dec 7 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Road Survey affecting #1, #2, #3 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0117-2022-12-06-23:01:55
Tue Dec 6 2022, 11:01PM
Wed Dec 7 2022, 4:59AM
101

South

Lane closure lasting 5 hours on Mainline for Shoulder Work affecting #3, #4 lane(s) in District: 7

From: Highland Ave Los Angeles to Sunset Blvd Los Angeles
View on Google Maps
ID: C101GB-0023-2022-12-06-23:59:00
Tue Dec 6 2022, 11:59PM
Wed Dec 7 2022, 5:01AM
101

South

Lane closure lasting 4 hours on Mainline for Road Survey affecting #1, #2, #3, #4 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0122-2022-12-06-23:59:04
Tue Dec 6 2022, 11:59PM
Wed Dec 7 2022, 3:59AM
101

South

Lane closure lasting 5 hours on Mainline for Demolition Work affecting #1, #2, #3 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Hollywood Freeway, Route 170 North Hollywood
View on Google Maps
ID: C101OA-0192-2022-12-06-23:59:17
Tue Dec 6 2022, 11:59PM
Wed Dec 7 2022, 4:59AM
101

South

Full closure lasting 5 hours on Connector for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 North Hollywood to Ventura Freeway, Route 134 North Hollywood
View on Google Maps
ID: C101TA-0003-2022-12-06-23:59:20
Tue Dec 6 2022, 11:59PM
Wed Dec 7 2022, 5:01AM
101

South

Lane closure lasting 5 hours on Mainline for Demolition Work affecting #1, #2, #3 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Woodman Ave Sherman Oaks
View on Google Maps
ID: C101OA-0052-2022-12-06-23:59:39
Tue Dec 6 2022, 11:59PM
Wed Dec 7 2022, 4:59AM
101

South

Lane closure lasting 4 hours on Mainline for Demolition Work affecting #1, #2, #3 lane(s) in District: 7

From: Havenhurst Ave Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0102-2022-12-06-23:59:39
Tue Dec 6 2022, 11:59PM
Wed Dec 7 2022, 3:59AM
101

South

Lane closure lasting 10 hours on Mainline for Median Barrier Work affecting #1 lane(s) in District: 5

From: Teague Avenue King City to Jolon Road (Southbound) King City
View on Google Maps
ID: C101CG-0003-2022-12-07-04:30:32
Wed Dec 7 2022, 4:30AM
Wed Dec 7 2022, 2:59PM
101

South

Lane closure lasting 10 hours on Conventional Hwy for Drainage Work affecting #2, Right Shoulder lane(s) in District: 1

From: Moss Cove Rest Area - Southbound Willits to Willits
View on Google Maps
ID: C101OA-0003-2022-12-07-07:01:00
Wed Dec 7 2022, 7:01AM
Wed Dec 7 2022, 5:01PM
101

South

Lane closure lasting 9 hours on Conventional Hwy for Fence Work affecting Right Shoulder lane(s) in District: 1

From: Presswood Overhead Bridge Ukiah to East Perkins St Overcrossing Ukiah
View on Google Maps
ID: C101UB-0013-2022-12-07-07:30:27
Wed Dec 7 2022, 7:30AM
Wed Dec 7 2022, 4:01PM
101

South

Full closure lasting 8 hours on On Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Canal Street King City to Route 101 King City
View on Google Maps
ID: C101CG-0017-2022-12-07-08:01:29
Wed Dec 7 2022, 8:01AM
Wed Dec 7 2022, 3:59PM
101

South

Full closure lasting 8 hours on Off Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Route 101 King City to First Street King City
View on Google Maps
ID: C101CG-0019-2022-12-07-08:01:33
Wed Dec 7 2022, 8:01AM
Wed Dec 7 2022, 3:59PM
101

South

Full closure lasting 8 hours on On Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Jolon Road (Southbound) King City to Route 101 King City
View on Google Maps
ID: C101CG-0029-2022-12-07-08:01:57
Wed Dec 7 2022, 8:01AM
Wed Dec 7 2022, 3:59PM
101

South

Moving closure lasting 6 hours on Mainline for Spray Operation affecting LMedianShd, #1 lane(s) in District: 5

From: Monterey County Line Paso Robles to Main Street Templeton
View on Google Maps
ID: M101QA-0003-2022-12-07-08:45:00
Wed Dec 7 2022, 8:45AM
Wed Dec 7 2022, 3:01PM
101

South

Moving closure lasting 3 hours on Mainline for Spray Operation affecting Median, LMedianShd, #1 lane(s) in District: 5

From: San Luis Obispo County Line Santa Maria to Alisos Canyon Road Los Alamos
View on Google Maps
ID: M101IA-0001-2022-12-07-09:01:00
Wed Dec 7 2022, 9:01AM
Wed Dec 7 2022, 12:01PM
101

South

Full closure lasting 6 hours on Off Ramp for Bridge Construction affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0055-2022-12-07-09:01:00
Wed Dec 7 2022, 9:01AM
Wed Dec 7 2022, 2:59PM
101

South

Full closure lasting 6 hours on On Ramp for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Seacliff, Route 1 Ventura to Ventura Freeway, Route 101 Ventura
View on Google Maps
ID: C101EA-0013-2022-12-07-09:01:15
Wed Dec 7 2022, 9:01AM
Wed Dec 7 2022, 2:59PM
101

South

Full closure lasting 6 hours on Off Ramp for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Ventura to Seacliff, Route 1 Ventura
View on Google Maps
ID: C101EA-0019-2022-12-07-09:01:38
Wed Dec 7 2022, 9:01AM
Wed Dec 7 2022, 2:59PM
101

South

Lane closure lasting 6 hours on Mainline for Tree Work affecting #4 lane(s) in District: 4

From: Waldo Sausalito to North End of Waldo Tunnel Sausalito
View on Google Maps
ID: N101EA-0003-2022-12-07-10:01:00
Wed Dec 7 2022, 10:01AM
Wed Dec 7 2022, 4:01PM
101

South

Full closure lasting 11 hours on Off Ramp for Bridge Construction affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0056-2022-12-07-19:01:00
Wed Dec 7 2022, 7:01PM
Thu Dec 8 2022, 5:59AM
101

South

Full closure lasting 11 hours on Off Ramp for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Ventura to Seacliff, Route 1 Ventura
View on Google Maps
ID: C101EA-0022-2022-12-07-19:01:02
Wed Dec 7 2022, 7:01PM
Thu Dec 8 2022, 5:59AM
101

South

Full closure lasting 11 hours on On Ramp for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Seacliff, Route 1 Ventura to Ventura Freeway, Route 101 Ventura
View on Google Maps
ID: C101EA-0016-2022-12-07-19:01:46
Wed Dec 7 2022, 7:01PM
Thu Dec 8 2022, 5:59AM
101

South

Lane closure lasting 9 hours on Mainline for Falsework Installation affecting #2, #3 lane(s) in District: 4

From: Baker Ave Santa Rosa to Baker Ave Santa Rosa
View on Google Maps
ID: C101VB-0020-2022-12-07-20:01:00
Wed Dec 7 2022, 8:01PM
Thu Dec 8 2022, 4:59AM
101

South

Lane closure lasting 9 hours on Toll Bridge for Bridge Construction affecting #1, #2, #3 lane(s) in District: 4

From: Monte Mar/Spencer Ave Sausalito to Golden Gate Br South Tower San Francisco
View on Google Maps
ID: P101LB-0015-2022-12-07-20:01:00
Wed Dec 7 2022, 8:01PM
Thu Dec 8 2022, 4:59AM
101

South

Full closure lasting 11 hours on On Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Evans Avenue Summerland to Route 101 Summerland
View on Google Maps
ID: C101KB-0014-2022-12-07-20:01:00
Wed Dec 7 2022, 8:01PM
Thu Dec 8 2022, 6:59AM
101

South

Full closure lasting 11 hours on On Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Sheffield Drive Santa Barbara to Route 101 Santa Barbara
View on Google Maps
ID: C101KB-0019-2022-12-07-20:01:00
Wed Dec 7 2022, 8:01PM
Thu Dec 8 2022, 6:59AM
101

South

Lane closure lasting 10 hours on Mainline for Bridge Construction affecting #1 lane(s) in District: 7

From: Cheesebro Rd / Palo Camado Canyon Rd Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0057-2022-12-07-20:01:00
Wed Dec 7 2022, 8:01PM
Thu Dec 8 2022, 5:59AM
101

South

Lane closure lasting 10 hours on Mainline for Bridge Construction affecting #4 lane(s) in District: 7

From: Cheesebro Rd / Palo Camado Canyon Rd Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0060-2022-12-07-20:01:00
Wed Dec 7 2022, 8:01PM
Thu Dec 8 2022, 5:59AM
101

South

Full closure lasting 11 hours on Off Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Route 101 Santa Barbara to Sheffield Drive Santa Barbara
View on Google Maps
ID: C101KB-0024-2022-12-07-20:01:14
Wed Dec 7 2022, 8:01PM
Thu Dec 8 2022, 6:59AM
101

South

Lane closure lasting 14 hours on Mainline for Bridge Construction affecting #1 lane(s) in District: 4

From: Tar Spring Creek Gilroy to Sargent Bridge Overhead Gilroy
View on Google Maps
ID: C101KB-0016-2022-12-07-20:01:58
Wed Dec 7 2022, 8:01PM
Thu Dec 8 2022, 9:59AM
101

South

Lane closure lasting 7 hours on Mainline for Maintenance Operation affecting Median, Left Shoulder, Left HOV, #1 lane(s) in District: 4

From: San Antonio R Oc Palo Alto to Rengstorff Av Oc Mountain View
View on Google Maps
ID: M101GA-0001-2022-12-07-21:01:00
Wed Dec 7 2022, 9:01PM
Thu Dec 8 2022, 4:01AM
101

South

Alternating Lanes closure lasting 10 hours on Mainline for Miscellaneous Work affecting #1, #2 lane(s) in District: 5

From: Padaro Lane SB Off-Ramp Summerland to Carpinteria Avenue SB Off-Ramp Carpinteria
View on Google Maps
ID: C101UB-0011-2022-12-07-21:01:00
Wed Dec 7 2022, 9:01PM
Thu Dec 8 2022, 6:59AM
101

South

Alternating Lanes closure lasting 10 hours on Mainline for Miscellaneous Work affecting #1, #2 lane(s) in District: 5

From: Sheffield Drive Santa Barbara to Padaro Lane SB Off-Ramp Summerland
View on Google Maps
ID: C101KB-0009-2022-12-07-21:01:11
Wed Dec 7 2022, 9:01PM
Thu Dec 8 2022, 6:59AM
101

South

Full closure lasting 8 hours on On Ramp for Bridge Construction affecting All lane(s) in District: 4

From: De La Cruz Bl Oc San Jose to Route 101 San Jose SB Loop On-Ramp from SB De La Cruz Blvd.
View on Google Maps
ID: C101QC-0030-2022-12-07-21:01:12
Wed Dec 7 2022, 9:01PM
Thu Dec 8 2022, 4:59AM
101

South

Lane closure lasting 9 hours on Mainline for Demolition Work affecting #1 lane(s) in District: 7

From: Havenhurst Ave Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0093-2022-12-07-21:01:12
Wed Dec 7 2022, 9:01PM
Thu Dec 8 2022, 5:59AM
101

South

Full closure lasting 8 hours on Off Ramp for K-rail Installation affecting All lane(s) in District: 4

From: Route 101 San Jose to De La Cruz Bl Oc San Jose SB Diagonal Off-Ramp to SB De La Cruz Blvd.
View on Google Maps
ID: C101QC-0034-2022-12-07-21:01:13
Wed Dec 7 2022, 9:01PM
Thu Dec 8 2022, 4:59AM
101

South

Lane closure lasting 13 hours on Mainline for Bridge Construction affecting #2 lane(s) in District: 4

From: Route 101 Gilroy to Route 101 Gilroy
View on Google Maps
ID: C101KB-0012-2022-12-07-21:01:18
Wed Dec 7 2022, 9:01PM
Thu Dec 8 2022, 9:59AM
101

South

Lane closure lasting 8 hours on Mainline for Electrical Work affecting #1, #2 lane(s) in District: 4

From: Ralston Ave Belmont to Brittan Ave Redwood City
View on Google Maps
ID: C101XB-0028-2022-12-07-21:01:28
Wed Dec 7 2022, 9:01PM
Thu Dec 8 2022, 5:01AM
101

South

Lane closure lasting 9 hours on Mainline for Road Survey affecting #1 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0108-2022-12-07-21:01:32
Wed Dec 7 2022, 9:01PM
Thu Dec 8 2022, 5:59AM
101

South

Lane closure lasting 9 hours on Mainline for Road Survey affecting #1 lane(s) in District: 7

From: Mulholland Dr / Valley Circle Blvd Woodland Hills to Topanga Canyon Blvd, Route 27 Woodland Hills
View on Google Maps
ID: C101OA-0148-2022-12-07-21:01:39
Wed Dec 7 2022, 9:01PM
Thu Dec 8 2022, 5:59AM
101

South

Alternating Lanes closure lasting 8 hours on Mainline for Bridge Construction affecting #1, #2, #3 lane(s) in District: 4

From: Route 237 Sunnyvale to Mathilda Ave Sunnyvale
View on Google Maps
ID: C101KB-0032-2022-12-07-21:01:44
Wed Dec 7 2022, 9:01PM
Thu Dec 8 2022, 4:59AM
101

South

Lane closure lasting 9 hours on Mainline for Road Survey affecting #1, #2 lane(s) in District: 7

From: Mulholland Dr / Valley Circle Blvd Woodland Hills to Topanga Canyon Blvd, Route 27 Woodland Hills
View on Google Maps
ID: C101OA-0153-2022-12-07-21:01:49
Wed Dec 7 2022, 9:01PM
Thu Dec 8 2022, 5:59AM
101

South

Lane closure lasting 6 hours on Mainline for Sign Work affecting #3 lane(s) in District: 4

From: Caulfield Lane OC Petaluma to Route 116/Lakeville Hwy Petaluma
View on Google Maps
ID: C101RA-0008-2022-12-07-22:01:00
Wed Dec 7 2022, 10:01PM
Thu Dec 8 2022, 3:59AM
101

South

Full closure lasting 8 hours on Off Ramp for Falsework Installation affecting All lane(s) in District: 4

From: Route 101 Santa Rosa to Baker Ave Santa Rosa 0.25 Miles North of Baker Overcrossing
View on Google Maps
ID: C101VB-0019-2022-12-07-22:01:00
Wed Dec 7 2022, 10:01PM
Thu Dec 8 2022, 5:59AM
101

South

Lane closure lasting 7 hours on Mainline for Bridge Construction affecting #1, #2 lane(s) in District: 7

From: Cheesebro Rd / Palo Camado Canyon Rd Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0058-2022-12-07-22:01:00
Wed Dec 7 2022, 10:01PM
Thu Dec 8 2022, 4:59AM
101

South

Lane closure lasting 7 hours on Mainline for Bridge Construction affecting #3, #4 lane(s) in District: 7

From: Cheesebro Rd / Palo Camado Canyon Rd Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0061-2022-12-07-22:01:00
Wed Dec 7 2022, 10:01PM
Thu Dec 8 2022, 4:59AM
101

South

Lane closure lasting 8 hours on Mainline for Demolition Work affecting #1 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Woodman Ave Sherman Oaks
View on Google Maps
ID: C101OA-0043-2022-12-07-22:01:02
Wed Dec 7 2022, 10:01PM
Thu Dec 8 2022, 5:59AM
101

South

Lane closure lasting 7 hours on Mainline for Demolition Work affecting #1, #2 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Woodman Ave Sherman Oaks
View on Google Maps
ID: C101OA-0048-2022-12-07-22:01:18
Wed Dec 7 2022, 10:01PM
Thu Dec 8 2022, 4:59AM
101

South

Lane closure lasting 7 hours on Mainline for Electrical Work affecting #1, #2 lane(s) in District: 4

From: 3rd/4th Ave San Mateo to Route 92 San Mateo
View on Google Maps
ID: C101XB-0014-2022-12-07-22:01:30
Wed Dec 7 2022, 10:01PM
Thu Dec 8 2022, 5:01AM
101

South

Alternating Lanes closure lasting 7 hours on Mainline for Survey Work affecting #4 lane(s) in District: 4

From: Oyster Point Blvd (East) South San Francisco to Butler Ave South San Francisco
View on Google Maps
ID: P101HB-0012-2022-12-07-22:01:41
Wed Dec 7 2022, 10:01PM
Thu Dec 8 2022, 5:01AM
101

South

Lane closure lasting 8 hours on Mainline for Demolition Work affecting #1 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Hollywood Freeway, Route 170 North Hollywood
View on Google Maps
ID: C101OA-0183-2022-12-07-22:01:42
Wed Dec 7 2022, 10:01PM
Thu Dec 8 2022, 5:59AM
101

South

Lane closure lasting 9 hours on Mainline for Bridge Construction affecting #1 lane(s) in District: 4

From: Tar Spring Creek Gilroy to Sargent Bridge Overhead Gilroy
View on Google Maps
ID: C101KB-0020-2022-12-07-22:01:43
Wed Dec 7 2022, 10:01PM
Thu Dec 8 2022, 6:59AM
101

South

Lane closure lasting 8 hours on Mainline for Road Survey affecting #1, #2 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0113-2022-12-07-22:01:45
Wed Dec 7 2022, 10:01PM
Thu Dec 8 2022, 5:59AM
101

South

Lane closure lasting 7 hours on Mainline for Electrical Work affecting #1, #2 lane(s) in District: 4

From: Broadway Burlingame to Anza Blvd Burlingame
View on Google Maps
ID: C101XB-0018-2022-12-07-22:01:54
Wed Dec 7 2022, 10:01PM
Thu Dec 8 2022, 5:01AM
101

South

Full closure lasting 8 hours on Connector for Striping Operation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0168-2022-12-07-22:01:56
Wed Dec 7 2022, 10:01PM
Thu Dec 8 2022, 5:59AM
101

South

Lane closure lasting 7 hours on Mainline for Demolition Work affecting #1, #2 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Hollywood Freeway, Route 170 North Hollywood
View on Google Maps
ID: C101OA-0188-2022-12-07-22:01:56
Wed Dec 7 2022, 10:01PM
Thu Dec 8 2022, 4:59AM
101

South

Full closure lasting 6 hours on Connector for Sign Work affecting All lane(s) in District: 4

From: Route 101 Petaluma to Route 116/Lakeville Hwy Petaluma
View on Google Maps
ID: C101RA-0003-2022-12-07-23:01:00
Wed Dec 7 2022, 11:01PM
Thu Dec 8 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Bridge Painting affecting #1 lane(s) in District: 4

From: Market Street / Octavia Street San Francisco to South Bound Connector Off-Ramp to East Bound i80 San Francisco
View on Google Maps
ID: C101XA-0007-2022-12-07-23:01:00
Wed Dec 7 2022, 11:01PM
Thu Dec 8 2022, 4:59AM
101

South

Lane closure lasting 5 hours on Mainline for Bridge Construction affecting #1, #2, #3 lane(s) in District: 7

From: Cheesebro Rd / Palo Camado Canyon Rd Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0059-2022-12-07-23:01:00
Wed Dec 7 2022, 11:01PM
Thu Dec 8 2022, 3:59AM
101

South

Lane closure lasting 5 hours on Mainline for Bridge Construction affecting #2, #3, #4 lane(s) in District: 7

From: Cheesebro Rd / Palo Camado Canyon Rd Agoura Hills to Liberty Canyon Rd Agoura Hills
View on Google Maps
ID: C101CA-0062-2022-12-07-23:01:00
Wed Dec 7 2022, 11:01PM
Thu Dec 8 2022, 3:59AM
101

South

Lane closure lasting 6 hours on Mainline for Road Survey affecting #1, #2, #3 lane(s) in District: 7

From: Mulholland Dr / Valley Circle Blvd Woodland Hills to Topanga Canyon Blvd, Route 27 Woodland Hills
View on Google Maps
ID: C101OA-0158-2022-12-07-23:01:00
Wed Dec 7 2022, 11:01PM
Thu Dec 8 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Demolition Work affecting #1, #2 lane(s) in District: 7

From: Havenhurst Ave Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0098-2022-12-07-23:01:28
Wed Dec 7 2022, 11:01PM
Thu Dec 8 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Bridge Construction affecting #1 lane(s) in District: 4

From: Santa Clara to De La Cruz Bl Oc Santa Clara SB Route 101 at Trimble Road/De La Cruz Blvd.
View on Google Maps
ID: C101QC-0022-2022-12-07-23:01:33
Wed Dec 7 2022, 11:01PM
Thu Dec 8 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Road Survey affecting #1, #2, #3 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0118-2022-12-07-23:01:55
Wed Dec 7 2022, 11:01PM
Thu Dec 8 2022, 4:59AM
101

South

Lane closure lasting 4 hours on Mainline for Road Survey affecting #1, #2, #3, #4 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0123-2022-12-07-23:59:04
Wed Dec 7 2022, 11:59PM
Thu Dec 8 2022, 3:59AM
101

South

Lane closure lasting 5 hours on Mainline for Demolition Work affecting #1, #2, #3 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Hollywood Freeway, Route 170 North Hollywood
View on Google Maps
ID: C101OA-0193-2022-12-07-23:59:17
Wed Dec 7 2022, 11:59PM
Thu Dec 8 2022, 4:59AM
101

South

Full closure lasting 5 hours on Connector for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 North Hollywood to Ventura Freeway, Route 134 North Hollywood
View on Google Maps
ID: C101TA-0004-2022-12-07-23:59:20
Wed Dec 7 2022, 11:59PM
Thu Dec 8 2022, 5:01AM
101

South

Lane closure lasting 5 hours on Mainline for Demolition Work affecting #1, #2, #3 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Woodman Ave Sherman Oaks
View on Google Maps
ID: C101OA-0053-2022-12-07-23:59:39
Wed Dec 7 2022, 11:59PM
Thu Dec 8 2022, 4:59AM
101

South

Lane closure lasting 4 hours on Mainline for Demolition Work affecting #1, #2, #3 lane(s) in District: 7

From: Havenhurst Ave Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0103-2022-12-07-23:59:39
Wed Dec 7 2022, 11:59PM
Thu Dec 8 2022, 3:59AM
101

South

Lane closure lasting 10 hours on Mainline for Median Barrier Work affecting #1 lane(s) in District: 5

From: Teague Avenue King City to Jolon Road (Southbound) King City
View on Google Maps
ID: C101CG-0004-2022-12-08-04:30:32
Thu Dec 8 2022, 4:30AM
Thu Dec 8 2022, 2:59PM
101

South

Lane closure lasting 10 hours on Conventional Hwy for Drainage Work affecting #2, Right Shoulder lane(s) in District: 1

From: Moss Cove Rest Area - Southbound Willits to Willits
View on Google Maps
ID: C101OA-0004-2022-12-08-07:01:00
Thu Dec 8 2022, 7:01AM
Thu Dec 8 2022, 5:01PM
101

South

Lane closure lasting 10 hours on Conventional Hwy for Utility Work affecting Right Shoulder, #2 lane(s) in District: 1

From: Metropolitan Rd Fortuna to Metropolitan Heights Rd Fortuna
View on Google Maps
ID: P101HA-0001-2022-12-08-07:01:00
Thu Dec 8 2022, 7:01AM
Thu Dec 8 2022, 5:01PM
101

South

Lane closure lasting 9 hours on Conventional Hwy for Fence Work affecting Right Shoulder lane(s) in District: 1

From: Presswood Overhead Bridge Ukiah to East Perkins St Overcrossing Ukiah
View on Google Maps
ID: C101UB-0014-2022-12-08-07:30:27
Thu Dec 8 2022, 7:30AM
Thu Dec 8 2022, 4:01PM
101

South

Full closure lasting 8 hours on On Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Canal Street King City to Route 101 King City
View on Google Maps
ID: C101CG-0018-2022-12-08-08:01:29
Thu Dec 8 2022, 8:01AM
Thu Dec 8 2022, 3:59PM
101

South

Full closure lasting 8 hours on Off Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Route 101 King City to First Street King City
View on Google Maps
ID: C101CG-0020-2022-12-08-08:01:33
Thu Dec 8 2022, 8:01AM
Thu Dec 8 2022, 3:59PM
101

South

Full closure lasting 8 hours on On Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Jolon Road (Southbound) King City to Route 101 King City
View on Google Maps
ID: C101CG-0030-2022-12-08-08:01:57
Thu Dec 8 2022, 8:01AM
Thu Dec 8 2022, 3:59PM
101

South

Moving closure lasting 7 hours on Mainline for Spray Operation affecting LMedianShd, #1 lane(s) in District: 5

From: Main Street Templeton to Route 58 Santa Margarita
View on Google Maps
ID: M101QA-0004-2022-12-08-08:30:00
Thu Dec 8 2022, 8:30AM
Thu Dec 8 2022, 3:01PM
101

South

Lane closure lasting 3 hours on Mainline for Guardrail Repair affecting #1 lane(s) in District: 5

From: Cannon Rd/Rocks Rd (Southbound) San Juan Bautista to Cannon Rd/Rocks Rd (Southbound) San Juan Bautista
View on Google Maps
ID: M101BA-0003-2022-12-08-09:01:00
Thu Dec 8 2022, 9:01AM
Thu Dec 8 2022, 12:01PM
101

South

Lane closure lasting 6 hours on Mainline for Tree Work affecting #4 lane(s) in District: 4

From: Waldo Sausalito to North End of Waldo Tunnel Sausalito
View on Google Maps
ID: N101EA-0004-2022-12-08-10:01:00
Thu Dec 8 2022, 10:01AM
Thu Dec 8 2022, 4:01PM
101

South

Full closure lasting 11 hours on Off Ramp for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Ventura to Seacliff, Route 1 Ventura
View on Google Maps
ID: C101EA-0009-2022-12-08-19:01:00
Thu Dec 8 2022, 7:01PM
Fri Dec 9 2022, 5:59AM
101

South

Full closure lasting 11 hours on On Ramp for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Seacliff, Route 1 Ventura to Ventura Freeway, Route 101 Ventura
View on Google Maps
ID: C101EA-0010-2022-12-08-19:01:00
Thu Dec 8 2022, 7:01PM
Fri Dec 9 2022, 5:59AM
101

South

Lane closure lasting 9 hours on Mainline for Falsework Installation affecting #2, #1 lane(s) in District: 4

From: Baker Ave Santa Rosa to Baker Ave Santa Rosa
View on Google Maps
ID: C101VB-0022-2022-12-08-20:01:00
Thu Dec 8 2022, 8:01PM
Fri Dec 9 2022, 4:59AM
101

South

Lane closure lasting 9 hours on Toll Bridge for Bridge Construction affecting #1, #2, #3 lane(s) in District: 4

From: Monte Mar/Spencer Ave Sausalito to Golden Gate Br South Tower San Francisco
View on Google Maps
ID: P101LB-0016-2022-12-08-20:01:00
Thu Dec 8 2022, 8:01PM
Fri Dec 9 2022, 4:59AM
101

South

Full closure lasting 11 hours on On Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Evans Avenue Summerland to Route 101 Summerland
View on Google Maps
ID: C101KB-0015-2022-12-08-20:01:00
Thu Dec 8 2022, 8:01PM
Fri Dec 9 2022, 6:59AM
101

South

Full closure lasting 11 hours on On Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Sheffield Drive Santa Barbara to Route 101 Santa Barbara
View on Google Maps
ID: C101KB-0020-2022-12-08-20:01:00
Thu Dec 8 2022, 8:01PM
Fri Dec 9 2022, 6:59AM
101

South

Full closure lasting 11 hours on Off Ramp for Miscellaneous Work affecting All lane(s) in District: 5

From: Route 101 Santa Barbara to Sheffield Drive Santa Barbara
View on Google Maps
ID: C101KB-0025-2022-12-08-20:01:14
Thu Dec 8 2022, 8:01PM
Fri Dec 9 2022, 6:59AM
101

South

Lane closure lasting 14 hours on Mainline for Bridge Construction affecting #1 lane(s) in District: 4

From: Tar Spring Creek Gilroy to Sargent Bridge Overhead Gilroy
View on Google Maps
ID: C101KB-0017-2022-12-08-20:01:58
Thu Dec 8 2022, 8:01PM
Fri Dec 9 2022, 9:59AM
101

South

Alternating Lanes closure lasting 10 hours on Mainline for Miscellaneous Work affecting #1, #2 lane(s) in District: 5

From: Padaro Lane SB Off-Ramp Summerland to Carpinteria Avenue SB Off-Ramp Carpinteria
View on Google Maps
ID: C101UB-0012-2022-12-08-21:01:00
Thu Dec 8 2022, 9:01PM
Fri Dec 9 2022, 6:59AM
101

South

Lane closure lasting 9 hours on Mainline for Paving Operation affecting #2 lane(s) in District: 7

From: Mussel Shoals/Ocean Dr Ventura to State Beaches Ventura
View on Google Maps
ID: C101EA-0008-2022-12-08-21:01:00
Thu Dec 8 2022, 9:01PM
Fri Dec 9 2022, 5:59AM
101

South

Alternating Lanes closure lasting 10 hours on Mainline for Miscellaneous Work affecting #1, #2 lane(s) in District: 5

From: Sheffield Drive Santa Barbara to Padaro Lane SB Off-Ramp Summerland
View on Google Maps
ID: C101KB-0010-2022-12-08-21:01:11
Thu Dec 8 2022, 9:01PM
Fri Dec 9 2022, 6:59AM
101

South

Full closure lasting 8 hours on On Ramp for Bridge Construction affecting All lane(s) in District: 4

From: De La Cruz Bl Oc San Jose to Route 101 San Jose SB Loop On-Ramp from SB De La Cruz Blvd.
View on Google Maps
ID: C101QC-0031-2022-12-08-21:01:12
Thu Dec 8 2022, 9:01PM
Fri Dec 9 2022, 4:59AM
101

South

Lane closure lasting 9 hours on Mainline for Demolition Work affecting #1 lane(s) in District: 7

From: Havenhurst Ave Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0094-2022-12-08-21:01:12
Thu Dec 8 2022, 9:01PM
Fri Dec 9 2022, 5:59AM
101

South

Full closure lasting 8 hours on Off Ramp for K-rail Installation affecting All lane(s) in District: 4

From: Route 101 San Jose to De La Cruz Bl Oc San Jose SB Diagonal Off-Ramp to SB De La Cruz Blvd.
View on Google Maps
ID: C101QC-0035-2022-12-08-21:01:13
Thu Dec 8 2022, 9:01PM
Fri Dec 9 2022, 4:59AM
101

South

Lane closure lasting 13 hours on Mainline for Bridge Construction affecting #2 lane(s) in District: 4

From: Route 101 Gilroy to Route 101 Gilroy
View on Google Maps
ID: C101KB-0013-2022-12-08-21:01:18
Thu Dec 8 2022, 9:01PM
Fri Dec 9 2022, 9:59AM
101

South

Lane closure lasting 8 hours on Mainline for Electrical Work affecting #1, #2 lane(s) in District: 4

From: Ralston Ave Belmont to Brittan Ave Redwood City
View on Google Maps
ID: C101XB-0029-2022-12-08-21:01:28
Thu Dec 8 2022, 9:01PM
Fri Dec 9 2022, 5:01AM
101

South

Lane closure lasting 9 hours on Mainline for Road Survey affecting #1 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0109-2022-12-08-21:01:32
Thu Dec 8 2022, 9:01PM
Fri Dec 9 2022, 5:59AM
101

South

Lane closure lasting 9 hours on Mainline for Road Survey affecting #1 lane(s) in District: 7

From: Mulholland Dr / Valley Circle Blvd Woodland Hills to Topanga Canyon Blvd, Route 27 Woodland Hills
View on Google Maps
ID: C101OA-0149-2022-12-08-21:01:39
Thu Dec 8 2022, 9:01PM
Fri Dec 9 2022, 5:59AM
101

South

Alternating Lanes closure lasting 8 hours on Mainline for Bridge Construction affecting #1, #2, #3 lane(s) in District: 4

From: Route 237 Sunnyvale to Mathilda Ave Sunnyvale
View on Google Maps
ID: C101KB-0033-2022-12-08-21:01:44
Thu Dec 8 2022, 9:01PM
Fri Dec 9 2022, 4:59AM
101

South

Lane closure lasting 9 hours on Mainline for Road Survey affecting #1, #2 lane(s) in District: 7

From: Mulholland Dr / Valley Circle Blvd Woodland Hills to Topanga Canyon Blvd, Route 27 Woodland Hills
View on Google Maps
ID: C101OA-0154-2022-12-08-21:01:49
Thu Dec 8 2022, 9:01PM
Fri Dec 9 2022, 5:59AM
101

South

Lane closure lasting 6 hours on Mainline for Sign Work affecting #3 lane(s) in District: 4

From: Caulfield Lane OC Petaluma to Route 116/Lakeville Hwy Petaluma
View on Google Maps
ID: C101RA-0009-2022-12-08-22:01:00
Thu Dec 8 2022, 10:01PM
Fri Dec 9 2022, 3:59AM
101

South

Lane closure lasting 8 hours on Mainline for Demolition Work affecting #1 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Woodman Ave Sherman Oaks
View on Google Maps
ID: C101OA-0044-2022-12-08-22:01:02
Thu Dec 8 2022, 10:01PM
Fri Dec 9 2022, 5:59AM
101

South

Lane closure lasting 7 hours on Mainline for Demolition Work affecting #1, #2 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Woodman Ave Sherman Oaks
View on Google Maps
ID: C101OA-0049-2022-12-08-22:01:18
Thu Dec 8 2022, 10:01PM
Fri Dec 9 2022, 4:59AM
101

South

Lane closure lasting 7 hours on Mainline for Electrical Work affecting #1, #2 lane(s) in District: 4

From: 3rd/4th Ave San Mateo to Route 92 San Mateo
View on Google Maps
ID: C101XB-0015-2022-12-08-22:01:30
Thu Dec 8 2022, 10:01PM
Fri Dec 9 2022, 5:01AM
101

South

Alternating Lanes closure lasting 7 hours on Mainline for Survey Work affecting #4 lane(s) in District: 4

From: Oyster Point Blvd (East) South San Francisco to Butler Ave South San Francisco
View on Google Maps
ID: P101HB-0013-2022-12-08-22:01:41
Thu Dec 8 2022, 10:01PM
Fri Dec 9 2022, 5:01AM
101

South

Lane closure lasting 8 hours on Mainline for Demolition Work affecting #1 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Hollywood Freeway, Route 170 North Hollywood
View on Google Maps
ID: C101OA-0184-2022-12-08-22:01:42
Thu Dec 8 2022, 10:01PM
Fri Dec 9 2022, 5:59AM
101

South

Lane closure lasting 9 hours on Mainline for Bridge Construction affecting #1 lane(s) in District: 4

From: Tar Spring Creek Gilroy to Sargent Bridge Overhead Gilroy
View on Google Maps
ID: C101KB-0021-2022-12-08-22:01:43
Thu Dec 8 2022, 10:01PM
Fri Dec 9 2022, 6:59AM
101

South

Lane closure lasting 8 hours on Mainline for Road Survey affecting #1, #2 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0114-2022-12-08-22:01:45
Thu Dec 8 2022, 10:01PM
Fri Dec 9 2022, 5:59AM
101

South

Lane closure lasting 7 hours on Mainline for Electrical Work affecting #1, #2 lane(s) in District: 4

From: Broadway Burlingame to Anza Blvd Burlingame
View on Google Maps
ID: C101XB-0019-2022-12-08-22:01:54
Thu Dec 8 2022, 10:01PM
Fri Dec 9 2022, 5:01AM
101

South

Full closure lasting 8 hours on Connector for Striping Operation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0169-2022-12-08-22:01:56
Thu Dec 8 2022, 10:01PM
Fri Dec 9 2022, 5:59AM
101

South

Lane closure lasting 7 hours on Mainline for Demolition Work affecting #1, #2 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Hollywood Freeway, Route 170 North Hollywood
View on Google Maps
ID: C101OA-0189-2022-12-08-22:01:56
Thu Dec 8 2022, 10:01PM
Fri Dec 9 2022, 4:59AM
101

South

Full closure lasting 5 hours on Connector for Sign Work affecting All lane(s) in District: 4

From: Route 101 Petaluma to Route 116/Lakeville Hwy Petaluma
View on Google Maps
ID: C101RA-0004-2022-12-08-23:01:00
Thu Dec 8 2022, 11:01PM
Fri Dec 9 2022, 3:59AM
101

South

Lane closure lasting 6 hours on Mainline for Bridge Painting affecting #1 lane(s) in District: 4

From: Market Street / Octavia Street San Francisco to South Bound Connector Off-Ramp to East Bound i80 San Francisco
View on Google Maps
ID: C101XA-0008-2022-12-08-23:01:00
Thu Dec 8 2022, 11:01PM
Fri Dec 9 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Road Survey affecting #1, #2, #3 lane(s) in District: 7

From: Mulholland Dr / Valley Circle Blvd Woodland Hills to Topanga Canyon Blvd, Route 27 Woodland Hills
View on Google Maps
ID: C101OA-0159-2022-12-08-23:01:00
Thu Dec 8 2022, 11:01PM
Fri Dec 9 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Demolition Work affecting #1, #2 lane(s) in District: 7

From: Havenhurst Ave Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0099-2022-12-08-23:01:28
Thu Dec 8 2022, 11:01PM
Fri Dec 9 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Bridge Construction affecting #1 lane(s) in District: 4

From: Santa Clara to De La Cruz Bl Oc Santa Clara SB Route 101 at Trimble Road/De La Cruz Blvd.
View on Google Maps
ID: C101QC-0023-2022-12-08-23:01:33
Thu Dec 8 2022, 11:01PM
Fri Dec 9 2022, 4:59AM
101

South

Lane closure lasting 6 hours on Mainline for Road Survey affecting #1, #2, #3 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0119-2022-12-08-23:01:55
Thu Dec 8 2022, 11:01PM
Fri Dec 9 2022, 4:59AM
101

South

Lane closure lasting 4 hours on Mainline for Road Survey affecting #1, #2, #3, #4 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0124-2022-12-08-23:59:04
Thu Dec 8 2022, 11:59PM
Fri Dec 9 2022, 3:59AM
101

South

Lane closure lasting 5 hours on Mainline for Demolition Work affecting #1, #2, #3 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Hollywood Freeway, Route 170 North Hollywood
View on Google Maps
ID: C101OA-0194-2022-12-08-23:59:17
Thu Dec 8 2022, 11:59PM
Fri Dec 9 2022, 4:59AM
101

South

Full closure lasting 5 hours on Connector for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 North Hollywood to Ventura Freeway, Route 134 North Hollywood
View on Google Maps
ID: C101TA-0005-2022-12-08-23:59:20
Thu Dec 8 2022, 11:59PM
Fri Dec 9 2022, 5:01AM
101

South

Lane closure lasting 5 hours on Mainline for Demolition Work affecting #1, #2, #3 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Woodman Ave Sherman Oaks
View on Google Maps
ID: C101OA-0054-2022-12-08-23:59:39
Thu Dec 8 2022, 11:59PM
Fri Dec 9 2022, 4:59AM
101

South

Lane closure lasting 4 hours on Mainline for Demolition Work affecting #1, #2, #3 lane(s) in District: 7

From: Havenhurst Ave Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0104-2022-12-08-23:59:39
Thu Dec 8 2022, 11:59PM
Fri Dec 9 2022, 3:59AM
101

South

Lane closure lasting 10 hours on Mainline for Median Barrier Work affecting #1 lane(s) in District: 5

From: Teague Avenue King City to Jolon Road (Southbound) King City
View on Google Maps
ID: C101CG-0005-2022-12-09-04:01:00
Fri Dec 9 2022, 4:01AM
Fri Dec 9 2022, 1:59PM
101

South

Lane closure lasting 10 hours on Conventional Hwy for Drainage Work affecting #2, Right Shoulder lane(s) in District: 1

From: Moss Cove Rest Area - Southbound Willits to Willits
View on Google Maps
ID: C101OA-0005-2022-12-09-07:01:00
Fri Dec 9 2022, 7:01AM
Fri Dec 9 2022, 5:01PM
101

South

Lane closure lasting 5 hours on Conventional Hwy for Fence Work affecting Right Shoulder lane(s) in District: 1

From: Presswood Overhead Bridge Ukiah to East Perkins St Overcrossing Ukiah
View on Google Maps
ID: C101UB-0015-2022-12-09-07:30:00
Fri Dec 9 2022, 7:30AM
Fri Dec 9 2022, 12:30PM
101

South

Full closure lasting 4 hours on On Ramp for ROW Maintenance affecting All lane(s) in District: 5

From: State Street Santa Barbara to Route 101 Santa Barbara
View on Google Maps
ID: C101GA-0011-2022-12-09-09:01:00
Fri Dec 9 2022, 9:01AM
Fri Dec 9 2022, 1:01PM
101

South

Lane closure lasting 6 hours on Mainline for Tree Work affecting #4 lane(s) in District: 4

From: Waldo Sausalito to North End of Waldo Tunnel Sausalito
View on Google Maps
ID: N101EA-0005-2022-12-09-10:01:00
Fri Dec 9 2022, 10:01AM
Fri Dec 9 2022, 4:01PM
101

South

Full closure lasting 2 days on Off Ramp for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Ventura to Seacliff, Route 1 Ventura
View on Google Maps
ID: C101EA-0004-2022-12-09-19:01:00
Fri Dec 9 2022, 7:01PM
Mon Dec 12 2022, 5:59AM
101

South

Full closure lasting 2 days on On Ramp for Pavement Rehabilitation affecting All lane(s) in District: 7

From: Seacliff, Route 1 Ventura to Ventura Freeway, Route 101 Ventura
View on Google Maps
ID: C101EA-0007-2022-12-09-19:01:00
Fri Dec 9 2022, 7:01PM
Mon Dec 12 2022, 5:59AM
101

South

Lane closure lasting 12 hours on Mainline for Falsework Installation affecting #1, #2 lane(s) in District: 4

From: Baker Ave Santa Rosa to Baker Ave Santa Rosa
View on Google Maps
ID: C101VB-0002-2022-12-09-20:01:00
Fri Dec 9 2022, 8:01PM
Sat Dec 10 2022, 7:59AM
101

South

Lane closure lasting 14 hours on Mainline for Bridge Construction affecting #1 lane(s) in District: 4

From: Tar Spring Creek Gilroy to Sargent Bridge Overhead Gilroy
View on Google Maps
ID: C101KB-0011-2022-12-09-20:01:58
Fri Dec 9 2022, 8:01PM
Sat Dec 10 2022, 9:59AM
101

South

Full closure lasting a day on On Ramp for Bridge Construction affecting All lane(s) in District: 4

From: De La Cruz Bl Oc San Jose to Route 101 San Jose SB Loop On-Ramp from SB De La Cruz Blvd.
View on Google Maps
ID: C101QC-0010-2022-12-09-21:01:00
Fri Dec 9 2022, 9:01PM
Sat Dec 10 2022, 8:59PM
101

South

Full closure lasting 11 hours on Off Ramp for K-rail Installation affecting All lane(s) in District: 4

From: Route 101 San Jose to De La Cruz Bl Oc San Jose SB Diagonal Off-Ramp to SB De La Cruz Blvd.
View on Google Maps
ID: C101QC-0013-2022-12-09-21:01:00
Fri Dec 9 2022, 9:01PM
Sat Dec 10 2022, 7:59AM
101

South

Lane closure lasting 9 hours on Toll Bridge for Bridge Construction affecting #1, #2, #3 lane(s) in District: 4

From: Monte Mar/Spencer Ave Sausalito to Golden Gate Br South Tower San Francisco
View on Google Maps
ID: P101LB-0002-2022-12-09-21:01:00
Fri Dec 9 2022, 9:01PM
Sat Dec 10 2022, 5:59AM
101

South

Lane closure lasting 11 hours on Mainline for Road Survey affecting #1 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0020-2022-12-09-21:01:00
Fri Dec 9 2022, 9:01PM
Sat Dec 10 2022, 7:59AM
101

South

Lane closure lasting 12 hours on Mainline for Road Survey affecting #1 lane(s) in District: 7

From: Mulholland Dr / Valley Circle Blvd Woodland Hills to Topanga Canyon Blvd, Route 27 Woodland Hills
View on Google Maps
ID: C101OA-0027-2022-12-09-21:01:00
Fri Dec 9 2022, 9:01PM
Sat Dec 10 2022, 8:59AM
101

South

Lane closure lasting 10 hours on Mainline for K-Rail Installation affecting #5 lane(s) in District: 7

From: White Oak Ave Encino to White Oak Ave Encino
View on Google Maps
ID: C101OB-0002-2022-12-09-21:01:00
Fri Dec 9 2022, 9:01PM
Sat Dec 10 2022, 6:59AM
101

South

Lane closure lasting 13 hours on Mainline for Bridge Construction affecting #2 lane(s) in District: 4

From: Route 101 Gilroy to Route 101 Gilroy
View on Google Maps
ID: C101KB-0010-2022-12-09-21:01:18
Fri Dec 9 2022, 9:01PM
Sat Dec 10 2022, 9:59AM
101

South

Lane closure lasting 8 hours on Mainline for Electrical Work affecting #1, #2 lane(s) in District: 4

From: Ralston Ave Belmont to Brittan Ave Redwood City
View on Google Maps
ID: C101XB-0006-2022-12-09-21:01:28
Fri Dec 9 2022, 9:01PM
Sat Dec 10 2022, 5:01AM
101

South

Alternating Lanes closure lasting 8 hours on Mainline for Bridge Construction affecting #1, #2, #3 lane(s) in District: 4

From: Route 237 Sunnyvale to Mathilda Ave Sunnyvale
View on Google Maps
ID: C101KB-0032-2022-12-09-21:01:44
Fri Dec 9 2022, 9:01PM
Sat Dec 10 2022, 4:59AM
101

South

Lane closure lasting 8 hours on Mainline for Sign Work affecting #3 lane(s) in District: 4

From: Caulfield Lane OC Petaluma to Route 116/Lakeville Hwy Petaluma
View on Google Maps
ID: C101RA-0002-2022-12-09-22:01:00
Fri Dec 9 2022, 10:01PM
Sat Dec 10 2022, 5:59AM
101

South

Lane closure lasting 11 hours on Mainline for Paving Operation affecting #2 lane(s) in District: 7

From: Mussel Shoals/Ocean Dr Ventura to State Beaches Ventura
View on Google Maps
ID: C101EA-0002-2022-12-09-22:01:00
Fri Dec 9 2022, 10:01PM
Sat Dec 10 2022, 8:59AM
101

South

Lane closure lasting 9 hours on Mainline for Demolition Work affecting #1 lane(s) in District: 7

From: Havenhurst Ave Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0016-2022-12-09-22:01:00
Fri Dec 9 2022, 10:01PM
Sat Dec 10 2022, 6:59AM
101

South

Full closure lasting 10 hours on Connector for Striping Operation affecting All lane(s) in District: 7

From: Ventura Freeway, Route 101 Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0029-2022-12-09-22:01:00
Fri Dec 9 2022, 10:01PM
Sat Dec 10 2022, 7:59AM
101

South

Lane closure lasting 7 hours on Mainline for Electrical Work affecting #1, #2 lane(s) in District: 4

From: 3rd/4th Ave San Mateo to Route 92 San Mateo
View on Google Maps
ID: C101XB-0003-2022-12-09-22:01:30
Fri Dec 9 2022, 10:01PM
Sat Dec 10 2022, 5:01AM
101

South

Alternating Lanes closure lasting 7 hours on Mainline for Survey Work affecting #4 lane(s) in District: 4

From: Oyster Point Blvd (East) South San Francisco to Butler Ave South San Francisco
View on Google Maps
ID: P101HB-0002-2022-12-09-22:01:41
Fri Dec 9 2022, 10:01PM
Sat Dec 10 2022, 5:01AM
101

South

Lane closure lasting 9 hours on Mainline for Bridge Construction affecting #1 lane(s) in District: 4

From: Tar Spring Creek Gilroy to Sargent Bridge Overhead Gilroy
View on Google Maps
ID: C101KB-0016-2022-12-09-22:01:43
Fri Dec 9 2022, 10:01PM
Sat Dec 10 2022, 6:59AM
101

South

Lane closure lasting 7 hours on Mainline for Electrical Work affecting #1, #2 lane(s) in District: 4

From: Broadway Burlingame to Anza Blvd Burlingame
View on Google Maps
ID: C101XB-0004-2022-12-09-22:01:54
Fri Dec 9 2022, 10:01PM
Sat Dec 10 2022, 5:01AM
101

South

Lane closure lasting 8 hours on Mainline for Demolition Work affecting #1 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Woodman Ave Sherman Oaks
View on Google Maps
ID: C101OA-0006-2022-12-09-23:01:00
Fri Dec 9 2022, 11:01PM
Sat Dec 10 2022, 6:59AM
101

South

Lane closure lasting 7 hours on Mainline for Demolition Work affecting #1, #2 lane(s) in District: 7

From: Havenhurst Ave Encino to San Diego Freeway, Route 405 Encino
View on Google Maps
ID: C101OA-0015-2022-12-09-23:01:00
Fri Dec 9 2022, 11:01PM
Sat Dec 10 2022, 5:59AM
101

South

Lane closure lasting 8 hours on Mainline for Road Survey affecting #1, #2 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0019-2022-12-09-23:01:00
Fri Dec 9 2022, 11:01PM
Sat Dec 10 2022, 6:59AM
101

South

Lane closure lasting 9 hours on Mainline for Road Survey affecting #1, #2 lane(s) in District: 7

From: Mulholland Dr / Valley Circle Blvd Woodland Hills to Topanga Canyon Blvd, Route 27 Woodland Hills
View on Google Maps
ID: C101OA-0026-2022-12-09-23:01:00
Fri Dec 9 2022, 11:01PM
Sat Dec 10 2022, 7:59AM
101

South

Lane closure lasting 8 hours on Mainline for K-Rail Installation affecting #5, #4 lane(s) in District: 7

From: White Oak Ave Encino to White Oak Ave Encino
View on Google Maps
ID: C101OB-0003-2022-12-09-23:01:00
Fri Dec 9 2022, 11:01PM
Sat Dec 10 2022, 6:59AM
101

South

Lane closure lasting 7 hours on Mainline for Demolition Work affecting #1, #2 lane(s) in District: 7

From: San Diego Freeway, Route 405 Encino to Woodman Ave Sherman Oaks
View on Google Maps
ID: C101OA-0005-2022-12-09-23:59:00
Fri Dec 9 2022, 11:59PM
Sat Dec 10 2022, 6:59AM
101

South

Lane closure lasting 6 hours on Mainline for Road Survey affecting #1, #2, #3 lane(s) in District: 7

From: Topanga Canyon Blvd, Route 27 Woodland Hills to Havenhurst Ave Encino
View on Google Maps
ID: C101OA-0018-2022-12-09-23:59:00
Fri Dec 9 2022, 11:59PM
Sat Dec 10 2022, 5:59AM
101

South

Lane closure lasting 6 hours on Mainline for Road Survey affecting #1, #2, #3 lane(s) in District: 7

From: Mulholland Dr / Valley Circle Blvd Woodland Hills to Topanga Canyon Blvd, Route 27 Woodland Hills
View on Google Maps
ID: C101OA-0025-2022-12-09-23:59:00
Fri Dec 9 2022, 11:59PM
Sat Dec 10 2022, 5:59AM
101

South

Lane closure lasting 10 hours on Mainline for Bridge Construction affecting #1 lane(s) in District: 4

From: Santa Clara to De La Cruz Bl Oc Santa Clara SB Route 101 at Trimble Road/De La Cruz Blvd.
View on Google Maps
ID: C101QC-0004-2022-12-10-00:01:00
Sat Dec 10 2022, 12:01AM
Sat Dec 10 2022, 9:59AM
101

South

Full closure lasting 6 hours on Connector for Sign Work affecting All lane(s) in District: 4

From: Route 101 Petaluma to Route 116/Lakeville Hwy Petaluma
View on Google Maps
ID: C101RA-0001-2022-12-10-00:01:00
Sat Dec 10 2022, 12:01AM
Sat Dec 10 2022, 5:59AM